|
Bids Are invited for Rc For Repairing Servicing Of Various Capacity Dea Sets At Hub Sites Under Ba Ajmer Visit Charges To Attend Fault Of Dea Set - Visit Charges To Attend Fault Of Dea Set On Call Basis / Complaint Basis On Behalf Of Written Job Order From Sde(E) Concerned For Different Te / Bts Sites Under Jurisidication Including Attending The Minor Faults Involving No Material And Submit Detailed Report For Major Fault To The Engineering -In-Charge I/C Fare Charges To Visit The Site From Hq Etc Complete As Reqd. , General Servicing Of The Up To 20 Kva Dea Sets - Pdg & Making Of General Servicing Of The Up To 20 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Charge I/C Complete Checking Of E/A Set After Servicing And Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , General Servicing Of More Than 20 Kva And Upto 32.5 Kva Dea Sets - Pdg & Making Of General Servicing Of The More Than 20 Kva & Upto 32.5 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Charge I/C Complete Checking Of E/A Set After Servicing And Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , General Servicing Of More Than 32.5 Kva And Up To 55 Kva Dea Sets - Pdg & Making Of General Servicing Of The More Than 32.5 Kva & Up To 55 Kva Dea Sets Of Different Make And Model Installed At Te/Bts Sites Comprising Of Following Jobs I/C Fare And Labour Charge I/C Complete Checking Of E/A Set After Servicing And Replacement Of Consumables For Proper Working As Per Manufacturer Recommendations Etc. Complete As Reqd. , Replacement Of Diesel Filter Element Set 1 Ltr - Replacement Of Diesel Filter Element Set ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Element 1 By 2 Ltr - Replacement Of Oil Filter Element ( 1/2 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Element 1 Ltr - Replacement Of Oil Filter Element ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Diesel Filter Element Set 1 By 2 Ltr - Replacement Of Oil Filter Element ( 1 Ltr ) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Oil Filter Set Suitable For Ea Set Of 50 To 55 Kva - Replacement Of Oil Filter Set Suitable For E/A Set Of 50/55 Kva In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Lubricating Oil Multi Grade 20W40 - Replacement Of Lubricating Oil Multi Grade ( 20W40) In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Steel Wire Braided Fuel Pipe Line - Replacement Of Steel Wire Braided Fuel Pipe Line In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Stop Solenoid 12 Volt - Replacement Of Stop Solenoid 12 Volt In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Starting Key With Switch - Replacement Of Starting Key With Switch In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Battery Leads Red And Black - Replacement Of Battery Leads Red & Black Standard Length & Size I/C Terminals In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Coolant For Radiator Of Superior Quality - Replacement Of Coolant For Radiator Of Superior Quality Or As Recommended By Manufacturer In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of V Belt - Replacement Of V-Belt In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Hose Pipe Set With Clips - Replacement Of Hose Pipe Set With Clips In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Fuel Feed Pump Assembly - Replacement Of Fuel Feed Pump Assembly In Existing Different Capacity And Make Of Engines I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Solid State Smps Or Scr Based Battery Chargers - Replacement Of Solid State Smps Or Scr Based Battery Chargers In Existing Different Capacity And Make E/A Set Amf / Manual Control Panels I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of Push Button Switch For Start Or Stop Or Reset - Replacement Of Push Button Switch For Start/ Stop/Reset In Existing Different Capacity And Make E/A Set Amf / Manual Control Panels I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Replacement Of 12 V Dc Or 220 V Ac Hr Meter Counter Type - Replacement Of 12 V Dc / 220 V Ac Hr Meter Counter Type In Existing Different Capacity And Make E/A Set Amf / Manual Control Panels I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. ( Note- Make And Model As Per Manufacturer Recommendation ) , Supply And Fixing Of 12 Volt Battery Operated Self Starter - Supplying & Fixing Of 12 Volt Battery Operated Self Starter Suitable For Starting Of Engine I/C Fixing The Same On The Dg Set Making Connections Testing Etc. Complete As Reqd. ( Make- Autolek Or Similar Superior Make) , Repairing And General Servicing Of The Existing Faulty Radiator Up To 55 Kva - Repairing & General Servicing Of The Existing Faulty Radiator Up To 55 Kva Diesel Engine Alternator Set By Repairing Of Leakage And Cleaning Of Copper Tubes With Help Of Cleaning Agents, Dismentling Of Radiator Assembly Including Transportation, Brazing And Testing For Leakage And Re-Installation After Repairing The Same Etc. Reqd. , Pdg General Servicing And Repairing Of 12 Volts Engine Starting Self - Pdg General Servicing And Repairing Of 12 Volts Engine Starting Self That I/C Dismentalling Of Equipments, Greasing And Oiling Of Bearing And Other Parts , Cleaning Of Self With Petrol , Replacement Of Carbon Brush , Housing Etc. Complete Checking Of Self And Testing And Fixing With Proper Alignment With Gears Etc Complete As Reqd. , Labour Charges For Top Overhauling Of Existing Dea Sets Up To 20 Kva - Labour Charges For Top Overhauling Of Existing Dea Sets Up To 20 Kva Capacity I/C Dismentalling Of All Parts, Radiator Cleaning, Replacement Of Engine Oil Coolant, Replacement Of Belts Safties, Meters If Reqd And Calibration Of Engine As Per Manufaturer Reccommendations. , Replacement Of The Liner Assembly With Rubber Ring Dea Sets Up To 20 Kva - Replacement Of The Liner Assembly With Rubber Ring In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts, Testing Etc As Reqd. , Replacement Of The Piston Set Without Piston Ring Set Dea Sets Up To 20 Kva - Replacement Of The Piston Set Without Piston Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Piston Ring Set Dea Sets Up To 20 Kva - Replacement Of Thepiston Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Set Of Gasket Including Head Gasket Dea Sets Up To 20 Kva - Replacement Of The Set Of Gasket I/C Head Gasket In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The O Ring Set Dea Sets Up To 20 Kva - Replacement Of The O Ring Set In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Cr Bearing Dea Sets Up To 20 Kva - Replacement Of Thecr Bearing In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Main Bearing Dea Sets Up To 20 Kva - Replacement Of The Main Bearing In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Oil Pressure Guage Dea Sets Up To 20 Kva - Replacement Of The Oil Pressure Guage In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Front Oil Seal Of Crank Shaft Dea Sets Up To 20 Kva - Replacement Of The Front Oil Seal ( Crank Shaft ) In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Replacement Of The Back Oil Seal Of Crank Shaft Dea Sets Up To 20 Kva - Replacement Of The Back Oil Seal ( Crank Shaft ) In Existing Dea Sets Up To 20 Kva Capacity Of Various Make And Model As Per Manufacturer Recommendations I/C Dismentling Of Faulty Parts, Fixing The New In Place Of Faulty Parts , Testing Etc As Reqd. , Repairing Of Cylinder Head - Repairing Of Cylinder Head ( One Job For Each Head ) With Replacement Of Valve Seat, Valve Guide, Valves And St Seal I/C Grinding , Lapping Of Valves I/C Turning, Grinding Of Head Etc Complete As Reqd. , Transportation Charges For Alternator Of Various Capacity Up To 55 Kva Up To 50Km - Transportation Charges For Alternator Of Various Capacity Up To 55 Kva From Site To The Nearest Workshop & Back After Repairing I/C Dismantling, Loading, Unloading, Transportation, Safe Handling & I/C Reinstallation, Making Connections, Power And Control Cable Connections Etc. And Testing On Existing Load For At Least One Hour After Commissioning Of The Alternator Etc. Complete As Reqd Up To 50Km. , Rewinding Of Main Stator Winding Of Alternator Up To 20 Kva - Rewinding Of Main Stator Winding Of Alternator Capacity Up To 20 Kva Of Existing Faulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Rewinding Of Main Rotor Winding Of Alternator Up To 20 Kva - Rewinding Of Main Rotor Winding Of Alternator Capacity Up To 20 Kva Of Existing Faulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Exciter Stator Winding Of Alternator Up To 55 Kva - Rewinding Of Exciter Stator Winding Of Alternator Capacity Up To 55 Kva Of Existing Faulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Exciter Rotor Winding Of Alternator Up To 55 Kva - Rewinding Of Exciter Rotor Winding Of Alternator Capacity Up To 55 Kva Of Existing Faulty Alternator Of Various Makes With Suitable Size Copper Enamelled Wire Including Providing Insulation Of Appropriate Class, Varnishing, Assembling I/C Testing Etc Complete As Required. , Replacement Or Repairing Of Avr - Replacement / Repairing Of Avr Make National Or S.S. For Existing Faulty Alteranator Upto 55 Kva Capacity I/C Dismentling The Faulty Item, Replacement By New One I/C Fixing, Testing, Commissioning Etc. Complete As Reqd. , Replacement Or Repairing Of Bearing Suitable For Above 20 Kva Alternator - Replacement / Repairing Of Bearing Suitable For Above 20 Kva Alternator For Existing Faulty Alteranator Upto 55 Kva Capacity I/C Dismentling The Faulty Item, Replacement By New One I/C Fixing, Testing, Commissioning Etc. Complete As Reqd. , Providing Of 2 Core 16 Sqmm - Providing Of 2 Core 16 Sqmm Pvc Insulated And Pvc Sheathed Aluminium Conductor Armoured Cable Of 1.1 Kv Grade Confirming To Relevent Is-Specification Complete As Reqd. ( Note - Cable Shall Be Provided At Site / Handed Over To Ssa Authority As Per Direction Of Engg. In Charge ) , Providing Of 4 Core 16 Sqmm - Providing Of 4 Core 16 Sqmm Pvc Insulated And Pvc Sheathed Aluminium Conductor Armoured Cable Of 1.1 Kv Grade Confirming To Relevent Is-Specification Complete As Reqd. ( Note - Cable Shall Be Provided At Site / Handed Over To Ssa Authority As Per Direction Of Engg. In Charge ) , Laying Of One No Upto 35 Sq. Mm On Wall Surface - Laying And Fixing Of One No Upto 35 Sq. Mm (Cl Ed With 1Mm Thick Saddle) Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Wall Surface As Required. , Laying Of One No Upto 35 Sq. Mmin The Existing Rcc Or Hume Or Metal Pipe - Laying Of One No Upto 35 Sq. Mm Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size In The Existing Rcc/ Hume/ Metal Pipe As Required. , Supply And Making End Termination For 4 X 16 Sq. Mm 28 Mm - Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For 4 X 16 Sq. Mm ( 28 Mm) For Pvc Insulated And Pvc Sheathed/Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required. , Sitc Of 63 S 2 Pole On Load Side Handle Operated Change Over Switch - Sitc Of 63 S 2 Pole On Load Side Handle Operated Change Over Switch In Steel Enclosure Capable Of Working 240 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Sitc Of 63 S Four Pole On Load Side Handle Operated Change Over Switch - Sitc Of 63 S Four Pole On Load Side Handle Operated Change Over Switch In Steel Enclosure Capable Of Working 415/500 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Providing And Fixing 63 Tpn Disconnector Fuse Switch Unit - Providing And Fixing 63 A Tpn Disconnector Fuse Switch Unit In Sheet Steel Enclosure A/W Hrc Fuses Capable Of Working 415/500 V I/C Drilling Hole On The Board, Making Connection, Earthing The Body Etc. As Reqd. , Repairing Of Fuel Injection Pump Fip, Nozzle And Injectors - Repairing Of Fuel Injection Pump(Fip), Nozzle & Injectors I/C Dismantling, Transportation Of Pump, Cleaning, Repairing, Testing And Refitting The Same On The Existing E/A Set I/C Replacement Of Faulty Components Etc. Complete As Reqd.. , Sitc Of 12 Volt 88Ah Lead Acid Maintenance Free Battery - Sitc Of 12 Volt 88Ah Lead Acid Maintenance Free Battery For Testing Of Above Dg Set, Including Installation At Last Site After Repairing Of All Dg Sets. Total Quantity : 2535
|