|
supply of asset performance management system (apms) , design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection, testing at manufacturers works & packing, training to owner engineers, supervision of installation, transportation to site of the items listed in part-i of mr, including supply of all mandatory spares, commissioning spares & special tools and tackles, first fill of consumables, erection material & documentation as specified in the specification & documentation as per job specification, system architecture etc. and other codes and standards attached or referred in material requisition. mr ref:tp-1zzza-el-rfq-0016_d1 , central control and supervisory system design, engineering, supply, testing, site integration, pre-commissioning & commissioning activites,supply of special tools and tackles (as per manufacturer recommendation for apms),supply of pre-commissioning,commissioning and start-up spares (as per manufacturers recomendation for apms), factory acceptance testing (fat) and site acceptance test (sat) as per mr: tp-1zzza-el-rfq-0016. commodity code: 166100 , mandatory / capital spare parts supply of mandatory spares as per spare parts - special tools and consumables philosophy annexure-4 “tp-1zzza-pq-prc-0005” for asset performance management system , training to 2 nos. of owner personnel at oem’s factory for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 10 days for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , supervision services for installation of the entire package from oem for 5 days note:the quoted charges shall include all travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of “24 months after commissioning or 36 months after dispatch whichever is earlier” over and above the standard warranty period. , supply of ac ups system (ss10), 115v,100% parallel redundant ups with common bypass. 115v,50hz, 20kva, 1ph, 0.8pf, ac ups system consisting of 2x100% parallel redundant configuration with common bypass, including condition monitoring as detailed in the specification tp-1zzza-el-spe-0017 & cell booster, as per typical sld & as per requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ups-501 , supply of ac ups system (ac distribution panel) ,115v ac, single front, non-draw out, compartmentalized db for ac ups having two incomer and outgoers as per feeder list & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-acdb-501 , supply of battery set for ups system, vented ni-cd type set of ni-cd type battery bank (2 x 100%) as per the duty cycle attached part of the requisition along with battery rack and other accessories as per sld & requisition documents and shall include testing after erection, pre-commissioning & commissioning. tag no:1u64-ss10-ba-506 & 1u64-ss10-ba-507 , supply of battery isolation breaker for each battery bank - flame proof (ex-d) suitable for installation in gas group ii-c as per sld & requisition documents for all the above battery banks supplied in this lot (2 nos.) , supply of copper cables and accessories like lug and gland, etc. for interconnection of ups system and its acdb & ups system and its battery - as per sld & requisition documents for all the above ups system supplied in this lot. refer note 16 of sos , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups (1u64-ss10-ups-501) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v ac ups battery bank (1u64-ss10-ba-506 & 1u64-ss10-ba-507) , supply of mandatory spares as per spare parts, special tools and consumables philosophy “tp-1zzza-pq-prc-0005” for 115v acdb (1u64-ss10-acdb-501) , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v ac ups battery bank. other accessories (like aprons and gloves) for safe and proper commissioning, operation and maintenance of the battery bank. , supply of special tools and tackles as per manufacturer’s recommendation for the above 115v acdb , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v ac ups battery bank , supply of pre-commissioning / commissioning / start-up spares as per manufacturer’s recommendation for the above 115v acdb , training to 2 nos. of owner personnel at oem’s factory for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , training to 10 nos. of owner personnel at nrep site for 1 week for the entire package (including condition monitoring). note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supervision services for installation of the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , bidder shall provide per diem rate for supply of commissioning / support engineer from oem who shall be stationed at nrep site for the duration of 1 month from the date of commissioning & handover for the entire package note:the quoted charges shall include travel, boarding, lodging, local transport, medical, all insurance including third party, income tax, all taxes & all other incidental charges. however, the actual man days consumed shall be considered for payment. , third party inspection (tpi) charges note:third party inspection agency (tpia) shall be engaged by bidder from owner approved list of tpia agencies and charges related to tpia shall be included by bidder. , additional warranty period of 24 months over and above the standard warranty period after the completion of the standard warranty as per general purchase conditions (gpc) / defect liability period as per general purchase conditions (gpc) of tender.
|