|
Construction Sign In Dimensions Of 2.0 Supply And Installation. Af_09/2024, Excavation And Loading Of Deposit Material With A 1.56 M³ Hydraulic Excavator, Transport With A 14 M³ Dump Truck - Natural Bed Highway - Curb In A Course Section, Reference Sinapi (100576) - Regularization And Compaction Of Soil Subgrade, Manual Trench Excavation. Af_09/2024 - Curved Curb Curb, Piping Of The Trench Bottom With A 30 To 60Kg Mallet, Application Of Plastic Tarpaulin For Execution Of Concrete Pavements, Supply, Preparation And Application Of Concrete Fck = 30 Mpa (With Brita 1 And 2), Precast Concrete Half-Cane Channel (D = 30 Cm) - Supply And Installation. Af_05/2025, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section, Manual Backfilling Of Trenches, With Percussion Soil Compactor. Af_08/2023, Concrete Pipe For Rainwater Collection Networks, Diameter Of 600 Mm, Rigid Joint, Installed, Preparation Of Trench Bottom With A Width Greater Than Or Equal To 1.5 M, Mouth For Simple Tubular Manhole D = 60 Cm In Concrete, Box With Rectangular Cast Iron Grid, In Masonry With Concrete Blocks, Rectangular Hydraulic Buried Box, In Masonry, Execution Of Concrete Channel Molded In Place, Dissipation Basin, Width 1 To 4 M, Basin Type In Hand Stone Fixed With Concrete, Reference Sinapi (92398) - Execution Of Flooring On Interlocking Floor, Reference Sinapi (94274) - Laying Of Guide (Curb) In Curved Section, Painting Of Curb With White Lime-Based Paint (Whitewash), Steel Regulation Plate D = 0.60 M - Type I + Si Retroreflective Film, Steel Warning Plate, Side Of 0.60 M, Supply And Installation Of Wooden Support For Signage Signs, On Ground, With H= Of 2, Manual Trench Excavation Af_09/2024 - Hydraulic Drainage Works, Manual Trench Excavation Af_09/2024 - Hydraulic Drainage Works - Substage, Transport With Dump Truck. 14 M³ - Highway In Natural Bed - Soil Preparation, Transport With 14 M³ Dump Truck - Highway In Natural Bed - Hydraulic Works, Transport With 14 M³ Dump Truck - Highway In Natural Bed - Floor Execution
|