Construction Work Of Elevated Tanks For Drinking Water – 2026.0019 New Construction Dps Appingedam. Project Description At Our Dps Appingedam Distribution Station We Will Replace The Existing 4 Clean Water Tanks With 3 New Concrete Clean Water Reservoirs. The New Reservoirs Have A Surface Area Of 20X30 Meters Each. The Pipe Space For Reservoirs One And Two Is 5.2 By 11.4 Meters. In Reservoirs 3 The Tube Space Is The Same Size As In Reservoirs One And Two. This Is In Preparation For A Possible 4Th Reservoir In The Future. The Height Of The Reservoirs Is 5 Meters From Floor To Bottom Of The Ceiling. The Floor Is Approximately 40 Cm Thick And The Ceiling Approximately 30 Cm. The Height Of The Pipe Space Is Approximately 2.6 Meters Below Ground Level And Approximately 8.4 Meters Above Ground Level. The Total Net Volume Of Each Reservoir Is Approximately 2700M³ Per Reservoir. Approximately 300 Bored Piles Will Be Installed Under The Reservoirs. The Piles Are Drilled To A Depth Of Approximately 22-23 Meters Below Ground Level. Part Of The Construction Also Includes Installing The Filling And Suction Pipes To Each Reservoir. These Pipes, 500Mm In Diameter, Are Connected To The Existing Pump Building. These Pipes Contain Outside Ground Valves And The Pipe Space Contains Specific Fittings And Instruments Such As Adjustable Valves And, Among Other Things, Pressure And Flow And Pressure Measurements. The Overflow Pipe Will Also End In The Reservoirs At The Required Heights. From The Reservoirs Through The Pipe Space, An Overflow Pipe Runs Around 600Mm Behind Towards The Existing Ditch. The Reservoirs Are Controlled From Our Business Automation, The Necessary Installation Of Cabling And Hardware Is Also Part Of This Work. To Complete The Work In Its Entirety, The Entire Site Of Approximately 80X130m Will Be Completely Redesigned. Attention Is Paid To Soil Structure, Functionality, Biodiversity And Area-Specific Design. The Work Is Carried Out In Three Phases. Build Reservoirs 1 And 2 In One Go, Build Reservoir 3 Including Pipe Space And Finally Finish The Site. The Demolition Of The Existing Reservoirs Is Carried Out By The Client Himself.
Contact Information
Address
Griffeweg 99
Contact No.
+31 503688588
Email
r.v.kan@wbgr.nl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114562366
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.