|
Construction Work - Renovation, Modernization Of Equipment Of The Unused Building Of The Former Wuch (Ul. Metalowcy) For The Purposes Of Establishing The Dębicki Incubator Of Entrepreneurship And The New Headquarters Of Cis. 1. Subject Of The Order: Execution Of Construction Works Related To The Comprehensive Renovation Of An Office Building Consisting Of Two Buildings: Building No. 1 (On The Plot 430/212 R.2 M. Dębica) And Building No. 2 (On The Plot 430/210 R.2 M. Dębica) Located At Ul. Metal Workers In Dębica. The Scope Of Works To Be Performed Includes: 1) Demolition And Dismantling Works, 2) Masonry Works (New Walls, Brickwork, Piercing Holes), 3) Insulation Works Inside Buildings (Anti-Moisture), 4) Flooring Works (Floor Coverings - Tiles, Carpets), 5) Finishing Works Of Walls And Ceilings (Plastering, Puttying, Painting, Wall Coverings Incl. Tiles, Casing With Plasterboards, Suspended Ceilings (Louvres, Acoustic Cladding)), 6) Facade Works Related To Insulation (Including Facade, All Sheet Metal Work, External Window Sills), 7) Insulation And Insulation Of Foundation Walls, 8) Replacement Of Roof Covering Layers With Insulation, 9) Replacement Of Windows And Doors (Internal And External), Including Replacement Of Internal Window Sills, 10) Execution Of Electrical Installations (Including: Energy-Saving Led Lighting With Cabling, Fire Protection And Low-Current Installations: It And Monitoring), 11) Execution Of Central Heating Installations 12) Construction Of A Gas Installation With A Gas Boiler Room, 13) Construction Of A Water And Sewage Installation (Faucets With Water-Saving Function, White Installation), 14) Construction Of A Mechanical Ventilation Installation, 15) Construction Of A Photovoltaic Installation With Energy Storage, 16) Construction Of An Air-Conditioning Installation, 17) Construction Of A Solar Installation, 18) Construction Of External Stairs With Railings, 19) Construction Of A Ramp For Disabled People, 20) Construction Of A Band Around The Building Made Of Concrete Cubes, 21) Delivery And Installation Of Movable Equipment (Without Furniture) And Fixed Equipment (Including Wipers, Typhlographic Boards, Portable Induction Loops, Sanitary Accessories (Including Handles For The Disabled), Marking The Surface Of Horizontal Communication, Door Number Plates (Including In Braill), Mobile Walls), 22) Other Accompanying Works. 2. Developing And Obtaining All Opinions, Protocols, Positions And Other Decisions Related To The Works Performed. 3. Development Of The Fire Safety Instructions And Instructions On What To Do In The Event Of A Fire For The Office Building (Building No. 1 + Building No. 2) Along With The Delivery And Installation Of Fire Equipment On All Floors (Including Hydrants, Fire Extinguishers, Wall Plaques (Pictograms), Evacuation Plan Boards, Etc. And Other Markings Resulting From The Above-Mentioned Instructions). Technical Parameters Of The Office Building: 1) Technical Parameters Of Building No. 1: - Area Tooth. 834.00 M2 - Volume Approx. 10,200 M3 - Area Usable Area 4151.10 M2 2) Technical Parameters Of Building No. 2: - Area Tooth. 566.00 M2 - Volume Approx. 7300.00 M3 - Area Usable Area 1656.00 M2. Note: A Full Description Of The Subject Of The Order Can Be Found In The Documentation Indicated In Opz, Section B Of Swz
|