1. Preliminary Services 1.1. Work Board 1.1.1. Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, 1.2. Mobilization And Demobilization 1.2.1. Mobilization And Demobilization, 1.3. Local Administration 1.3.1. Full Site Civil Engineer With Additional Charges, 1.3.2. Surveyor With Additional Charges, 1.3.3. Laboratory Technician With Additional Charges, 2. Earthmoving 2.1 Vertical Excavation - Including Removal Of Slabs And Existing Sidewalk D=1, 60 E=1, 30 Dmt=12, 50Km 2.1.1 Excavation, Loading And Transport Of 1St Category Material - Dmt From 2,500 To 3,000 M - Service Path Paved - With Excavator And 14 M³ Dump Truck, 2.1.2 Simple Concrete Demolition With Hammer, 2.1.3 Loading, Maneuvering And Unloading Aggregates Or Soil In 10 M³ Dump Truck - Loading With 3, 40 M³ Loader And Free Unloading, 2.1.4 Transport With 10 M³ Dump Truck M³ - Paved Highway, 3 Storm Drainage 3.1 Galleries And Wings 3.1.1 Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. From 1.5 M To 2.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, 3.1.2 Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_01/2024, 3.1.3 Concrete Pipe (Simple) For Rainwater Collection Networks, 300 Mm Diameter, Rigid Joint, Installed In A Location With Low Level Of Interference - Supply And Installation. Af_03/2024, 3.1.4. Concrete Tube For Rainwater Collection Networks, 400 Mm Diameter, Installed In A Location With Low Level Of Interference - Supply And Installation.Af_03/2024, 3.1.5 Concrete Tube For Rainwater Collection Networks, 500 Mm Diameter, 3.1.6 Concrete Tube For Rainwater Collection Networks Rainwater, 600 Mm Diameter, 3.1.7 Box With Rectangular Cast Iron Grate, In Masonry With Solid Ceramic Bricks, Internal Dimensions: 0.30 0° Condensity, Including Forms And Materials. Af_07/2021, 3.1.9 Manual Trench Backfilling, With Vibrating Plate. Af_08/2023, 3.1.10 Transport With 14 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, 4 Flexible Asphalt Paving In Asphalt Concrete 4.1 Acquisition And Transport Of Bituminous Material - Consumption Eai=1, 1Lm² Rr-2C=0, 48L/M² - Dmt (Repair X Plant) 285Km 4.1.1 Asphalt Emulsion For Priming, 4.1.2 Asphalt Emulsion Rr-2C, 4.1.3 Asphalt Cement Cap 50-70, 4.1.4 Transport With Tank Truck For Transporting Asphalt Material Of 20000 L, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, 4.1.5 Transport With 30,000 L Asphalt Material Transport Tank Truck, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020, 4.2 Asphalt Paving - Ms=20Cm D=1, 70T/M³ - Bgs=20Cm D=1, 70T/M³ - Cbuq=5, 00Cm Content=5, 8% D=2, 40T/M³ - Dmt=6Km - E=30% 4.2.1 Regularization E Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, 4.2.2 Construction Of Base And Sub-Base For Dry Macadam Paving, 20 Cm Thick - Exclusive Of Loading And Transport. Af_09/2024, 4.2.3 Transport With 10 M³ Dump Truck - Paved Highway, 4.2.4 Construction Of Base And Sub-Base For Pavi
|