Urban Railway Works – Maintenance And Repair Of Paved Tram Tracks. Carrying Out Maintenance And Repair Works Of Paved Superstructure Road Railway (Electric) Tracks That Exceed Their Maintenance Capacity (Including Preparatory Work, Demolition And Repair Tasks). Main Items And Planned Quantities For 24 Months: I. Preparatory Works: - Demarcation Of The Work Area: 200 M2 - Construction Of A Temporary Pedestrian Crossing: 20 M2 - Construction And Demolition Of A Temporary Detour, Material Provided By Bkv Zrt.: 1 Occasion - Installation Of Guest Detour, Guest Detour Provided By The Bidder: 1 Occasion - Construction Of Temporary Pavement: 10 M3 Ii. Demolition Works: - Demolition Of Asphalt/Concrete Layer: 200 M3 - Demolition Of Rails: 252 Cm - Demolition Of The Semi-Change Part Of Ph Turnout (R50): 1 Piece - Demolition Of The Half-Change Part Of Ph Turnout (R100): 1 Piece - Demolition Of The Intermediate Part Of Ph Turnout (R50): 1 Piece - Demolition Of The Intermediate Part Of Ph Turnout (R100): 1 Piece - Ph Turnout Demolition Of The Crossing Part Of (R50): 1 Piece - Demolition Of The Crossing Part Of Ph Detour (R100): 1 Piece - Asphalt Edge Cutting: 400 M - Asphalt/Concrete Milling: 66 M3 Iii. Repair Works: - Placement Of Vignol Rail - R260: 24 Cm - Placement Of Vignol Rail - R260, Rail Provided By Bkv Zrt.: 24 Cm - Placement Of Vignol Rail - R350ht: 24 Cm - Placement Of Vignol Rail - R350ht, Rail Provided By Bkv Zrt.: 24 Cm - Placement Of Trough Rail - R220g1: 18 Cm - Placement Of Trough Rail - R220g1, Rail Provided By Bkv Zrt.: 72 Cm - Placement Of Trough Rail - R290ght: 18 Cm - Placement Of Trough Rail - R290ght, Rail Provided By Bkv Zrt.: 36 Cm - Preparation Of Rolled Asphalt Layer: 100 M3 - Installation Of Ph Detour (R50) Half-Change Structure: 1 Pc - Ph Installation Of A Detour (R50) Half-Reverse Structure, Half-Reverse Provided By Bkv Zrt.: 1 Pc - Ph Detour (R100) Installation Of Half-Reverse Structure: 1 Pc - Installation Of Ph Detour (R100) Half-Reverse Structure, Half-Reverse Provided By Bkv Zrt.: 1 Pc - Installation Of Complete Ph Detour (R50): 1 Pc. - Installation Of Complete Ph Detour (R50), Detour Provided By Bkv Zrt.: 1 Csop. - Installation Of A Complete Ph Bypass (R100): 1 Pc. - Installation Of Complete Ph Detour (R100), Detour Is Provided By Bkv Zrt.: 1 Csop. (The Additional Items And The Quantities Assigned To Them Were Recorded In The Unpriced Budget). The Tenderer Undertakes To Issue An Order With A Total Value Of 70% Of The Total Sum Fixed In The Framework Contract. The Tenderer Draws Attention To The 321/2015. (X.30.) Government Order. To The Provisions Of Paragraph (3) Of § 46. As Part Of A Professional Offer: - The Tenderer Is Obliged To Submit The Budget Attached To The Public Procurement Documents With Pricing. The Tenderer Must State In His Offer, Signed In A Corporate Manner, That: - What Is The Duration Of The Warranty He Undertakes (Mandatory 12 Months And The Undertaken Additional Warranty In Total); - In The Event Of A Breakdown During The Warranty Period, Undertakes To Compensate For The Damages Resulting From The Breakdown; - Acknowledges That The Bidder Provides A Preparation Time Of 60 Days From The Communication Of The Orders; - Undertakes That As Part Of The Warranty Obligation
Contact Information
Contact No.
+36 14616578
Email
kozbeszerzes@bkv.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114551444
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.