Goods-Packing Sacks - Framework Agreement For The Purchase Of Big-Bag Bags. In Relation To The Storage And Transport Of Animal By-Products, The Tenderer Wishes To Enter Into A Framework Agreement In Order To Implement The Procurement Of Big-Bag Bags. Parameters Of The Product To Be Purchased: Bigbag Type: Standard Fibc Dimensions Internal Length (Cm): 100Cm, +/- 2 Cm Internal Width (Cm): 85Cm, +/- 2 Cm Internal Height (Cm): 180Cm, +/- 2 Cm Safety Data Safety Factor: Minimum 5:1 Filling Weight: Minimum 1250Kg Fabric Fabric: 140Gr/M2, +/-5 Gr/M2 Lamination: + 30 Gr/M2 Lamination, +/-5 Gr/M2 Fabric Type: Circular Weave, U-Panel Seam Fabric Color: White Uv Stability: Iso 21898 :2024 Conformity According To The Annex Is Required Seam Seam: White Stitching: Safety Lock Dust Sealing Seam: J Sewing Technology, With Double Dust Seal. Seam Location: On The Bottom Of The Bag On The Longer Side Lifting System Type Of Tabs Corner Tab Tab Length 0 + 25 Cm, +/- 1 Cm Tab Color White Tab Width 40 Mm, +/- 2 Mm Total Load Capacity Of Tabs (4 Pcs. 1 Per Corner): Min 1.5 Tons Filling System Filling System Filling Pipe Filling System Diameter 35 Cm, +/- 1 Cm Filling System Length 50 Cm, +/- 2 Cm Emptying System Emptying System Emptying Pipe Diameter Of Emptying System 35 Cm, +/- 1 Cm Length Of Emptying System 50 Cm, +/- 2 Cm Other Other Requirements Specified By The Contracting Authority Document Bag (For The Purpose Of Storing Accompanying Documents): 1 X A/4 Document Bag Placement: Vertical, Must Be Placed In The Upper Seam On The Longer Side Of The Bag Additional Technical Data Bag Total Weight: Minimum 2170 G Net Weight Min. Net 2150 G Material Used Recycled Material Content: May Not Contain Recycled Material. Fabric Material: 100% Pp The Bidder Must Submit The Technical Specification Table With His Bid In Connection With His Proposal. The Product You Wish To Purchase Must Comply With The Mandatory Requirements Contained In The Mszn Iso 21898:2024 Certificate. Request For Tenders Wishes To Conclude A Framework Agreement For A Framework Quantity Of 80,000 Units. On The Basis Of The Framework Agreement Concluded With Several Bidders, The Implementation Of The Given Public Procurement Is Carried Out In Accordance With Kbt. It Is Done On The Basis Of § 105, Paragraph (2), Point C), Since The Framework Agreement Does Not Include All The Conditions Of The Contract(S) For The Implementation Of The Public Procurement Granted On The Basis Of It, With The Re-Opening Of The Competition, The Kbt. According To Section 105, Paragraphs (3)-(5). During The Re-Opening Of The Competition, The Winning Tenderer Is Obliged To Make An Offer Equal To Or More Favorable To The Tenderer Than That Contained In The Framework Agreement. Based On The Provisions Of § 105, Paragraph (4). The Maximum Deadline For Individual Contracts Is 5 Months From The Conclusion Of The Individual Contract. The Applicant States That The Minimum Order To Be Obtained During The Competition Reopenings Is 10,000 Units. The Tenderer Draws The Tenderers Attention To The Fact That If The Call For Tenders Or The Public Procurement Documents Made Available Contain A Reference To A Specific Make, Origin Or Type Of Item, The Designation Is Only Indicative Of The Nature Of The Item
Contact Information
Address
Illatos Út 23
Contact No.
+36 706638392
Email
miskolczib@atev.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114542131
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.