|
Energy And Related Services – New Construction Of Subway Workshop Hall 4, Barmbek Depot (Bba-H4) - Tga Electrical Planning (Lph 5 - 8) [Ba]. The Hochbahn Intends To Gradually Award The Necessary Engineering Services For The Construction Of A New Subway Workshop Hall With A Complete Basement With Additional Auxiliary Workshops, Social And Office Rooms, Technical Rooms And A Separate Subway Training Center In The Free And Hanseatic City Of Hamburg. Planning Services For Electrical Installations For Buildings Are Awarded For The Following System Groups In Accordance With The Hoai 2021: 4. Power Systems, 5. Telecommunications And Information Technology Systems. The Service Profiles Of Object, Structural, Track Construction, Civil Engineering And Demolition Planning As Well As The Other Tga System Groups Are Commissioned Separately By Hamburger Hochbahn Ag. The Integration Of Further Specialist Planning Into The Specialist Planning And Construction Process Is The Task Of The Planner. The Area To Be Planned Is Located To The South, Along The Railway Tracks, At The Barmbek Subway Depot In Hamburg-Winterhude. In Order To Meet The Current And Future Requirements Of Subway Operations, It Is Necessary To Dismantle The Existing Workshop Hall From The 1910S (Current Floor Space Approx. 4,800 M²) And Another Nearby Building And Replace Them With A New Building. The Area Concept Of The New Building Includes The Following Structure: Workshop Hall With The Areas: - Workshop Hall, Basement + Ground Floor Approx. 11,800 M² (Plus Roof Work Stand Level) - Auxiliary Workshops, Office And Social Rooms Workshop, 1St Floor (North Bar) And 2Nd Floor, Approx. 3,600 M² - Subway Training Center Including Emergency Control Center, 3Rd Floor, Approx. 3,300 M² - Technical Premises (Tga And Elt), All Floors, Approx. 840 M² - Roof Areas On The 1St Floor, Approx. 2,400 M² - Roof Areas For The Pv System On The 3Rd Floor, 3,300 M² The Main Contract Dates Are: - Start Of The Detailed Planning Elt - 10/2026, - Start Of Demolition Work - 08/2026, - Start Of Construction Work (New Building) - 05/2027, - Start Of Property Monitoring Elt - 03/2029, - Completion Of The Construction Project - 06/2030, - Elimination Of Defects, Documentation, Commercial Conclusion - 02/2031,
|