The Subject Of The Order Is The Development Of Public Infrastructure In The Area Of The Borek Fishing Area In Bieżuń. The Scope Of Works Includes The Implementation Of At Least: The Following Works: - Demolition Works - Disassembly Of The Old Shelter - Paving Stone Surfaces - Construction Of A Paving Stone Surface On The Substructure With An Area Of 215.93 M2, - Shelters - Two Wooden Shelters Covered With Shingles, - Electrical Installation - Connection Of The Electrical Installation For The Lighting Of The Shelters, Together With The Delivery And Installation Of Led Lighting Fixtures - Outdoor Gym - Six Double Gym Equipment On Pylons In Accordance With With Design Documentationtask Co-Financed As Part Of The Intervention I.13.1 Leader/Community-Led Local Development (Clld) - Lsr Implementation Componentall Installed Devices And Elements Of Gym Equipment Must Have Approvals And Safety Certificates Confirming That They Were Made Based On Applicable Standards In This Area And Be Approved For Use In This Type Of Facilitiesall Devices Used In The Gym Must Be Made In Accordance With The Requirements Of The Pn-En Standard 16630:2015-06All Devices And Elements Of The Gyms Equipment Should Be Founded And Installed In Accordance With The Pn En 1176-1:2009 And Pn En 1176-7:2009 Standards And The Land Development Plan.3.2 A Detailed Description Of The Subject Of The Order Is Included In The Appendices To The Swz: Annex No. 9 To The Swz - Gym - Documentation, Stwiorb, Bill Of Quantities. Attachment No. 10 To Swz - Shelters - Documentation, Stwiorb, Bill Of Quantities. The Contractor Should Calculate The Value Of The Works Based On The Attached Documentation. The Attached Bill Of Quantities Are Supporting Material For Calculating The Lump Sum Price Of The Offer, And Any Elements Of The Works Resulting From The Documentation Not Included In Them Cannot Constitute The Basis For The Contractor To Demand Additional Remuneration.3.3 The Works That Are The Subject Of The Contract Should Be Performed With Due Care In Accordance With The Documentation, Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of Works, Applicable Regulations, Standards And Principles Of Modern Technical Knowledge And Arrangements Made During The Implementation Of The Works.3.4 The Materials Used By The Contractor During The Execution Of The Subject Of The Order Should Be Brand New And Meet The Quality Requirements Of Products Approved For Use In Construction In Accordance With The Construction Law And Have Appropriate Approvals And Certificates.3.5 The Required Minimum Warranty Period For The Completed Construction Works Is 24 Months. Note: The Required Warranty Period Is The Criterion For Evaluating Offers. The Warranty Period Is Equal To The Warranty Period.3.6 The Contractor Will Be Responsible For Safety In The Area Where The Works Will Be Performed From The Commencement Of The Works Until The Completion Of The Investment (Completed With An Acceptance Protoc
Contact Information
Address
Gmina Bieżuń,Bieżuń,09-320,Mazowieckie,Pl922 - Ciechanowski
Contact No.
+48236578056
Email
umig@biezun.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114512857
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.