|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Construction Shed For Storage And Tooling Type-I, Internal Area 14, 52M2, Made Of Resin Plywood, Including Furniture (Small Work, Effective Up To 30 Men), Der-Mg Standard, Temporary Water Connection For Site, Including Hydrometer And Easel For Water Measurement - Main Entrance, In Steel Galvanized Dn 20Mm (1/2) - Dealership Standard, Sewer Connection For Construction Shed On Site, Exclusive Septic Tank, Temporary Connection With Overhead Power Input, Cemig Standard, Installed Load From 15, 1Kva To 30Kva, Three-Phase, With Underground Output, Including Pole, Meter Box, Circuit Breaker, Busbar, Grounding And Accessories, Rental Of Work With Template Of Boards Pointed Every 2.00M, Reuse (2X), Including Monitoring Of Topographic Team To Mark Topographic Point, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation To Place Formwork). Af_01/2024, Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_08/2017, Manufacture, Assembly And Disassembly Of Shoe Formwork, Made From Resin Plywood Sheet, E=17 Mm, 4 Uses. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Of Footings, Fck 20 Mpa, Using Jerica - Laying, Densification And Finishing, Manual Trench Backfilling, Including Mechanized Spreading And Compaction With Vibrating Plate, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, With Use And Jerica - Launch, Plating Applied To Masonry And Internal Concrete Structures, Using A Trowel. Mortar Mix 1:3 Prepared In A 400L Concrete Mixer. Af_06/2014, Surface Waterproofing With Polymeric Mortar / Acrylic Membrane, 3 Coats. Af_06/2018 (Wet Areas - Before Coating), Priming With Asphalt Emulsion - Eai, Manual Cleaning, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 8 Uses. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Without Propping, Made Of Resin Wood Sheet, 8 Uses., Propping With Wooden Fork, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 8 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 10 Steel, Unidirectional Precast Slab, Bi-Supported, For Flooring, Ceramic Filling, Conventional Joist, Total Slab Height (Filling+Cover) = (8+4). Af_11/2020, Concreting Pillars, F
|