|
Bids Are invited for Custom Bid For Services - For The Work Of Overhauling, Replacement Of Packaging And Other Associated Works On 05/08/10 Mva Power T/Fs Situated At Various S/S Under Edd, Kheragarh, Agra - 05 Mva T/F At 33/11 Kv S/S Saiyan, Ladukhera, Tehra, Kheragarh, Ayela. , Opening Of All Connections Of 05 Mva Power Tf As Per Direction Of Supervising Engineer. , Drain Out Of Tfs Oil And Store In Drum For Replacement Of Damaged Packing Of 05 Mva Power Tf. , Opening Of 33 Kv, 11 Kv Busing Rod Very Carefully And Removal Of Damage Packing And Replacement Of Packing And Fixing Of 33 Kv, 11 Kv Busing Rod Complete. , Replacement Of Damaged Inspection Cover Packing With New Packing And Fixing. , Replacement Of Lt Side Rod 02 No (Required Material Provided By Contractor At His Own Cost). , Radiator Air Release And Balb Seal Replacement. , Opening Of Radiator And Removal Of Damage Packing Fixing Packing Of Radiator And Fitting Of Radiator Of 05 Mva Power T/Fs By Help Of Craine And As Per Direction Of Supervising Engineer. , Equaliser Pipe Remove Damage Packing And Dry Foum Fixing New Packing. , Replacement Of Oil Level Gauge Damage Glass And Packing. , Filling Of Transformer Oil In Ther Power T/F After Replacement Of All Required Packing As Per Direction Of Supervising Engineer. , Making Of All Connections Of 05 Mva Power T/Fs As Per Direction Of Supervising Engineer. , All Packing Set Complete Made Of Cork Sheet For 05 Mva Power T/Fs (Required Material Provided By Contractor At His Own Cost). , Centrifuging Of Power Tf Oil Of 05 Mva. , Repairing Of Relay Of C&R Pennal. , 08 Mva T/F No. At 33/11 Kv S/S Sarendhi. , Opening Of All Connections Of 8 Mva Power Tf As Per Direction Of Supervising Engineer. , Drain Out Of Tfs Oil And Store In Drum For Replacement Of Damaged Packing Of 08 Mva Power Tf. , Opening Of 33 Kv, 11 Kv Busing Rod Very Carefully And Removal Of Damage Packing And Replacement Of Packing And Fixing Of 33 Kv, 11 Kv Busing Rod Complete. , Replacement Of Tap Changer Packing As Per Direction Of Supervising Engineer. , Radiator Air Release And Balb Seal Replacement. , Opening Of Conservator Tank By The Help Of Craine Removal Of Damaged Packing. Cleaning Of Surface Fixing Of Packing And Fitting Of Conservator Tank. , Opening Of Radiator And Removal Of Damage Packing Fixing Packing Of Radiator And Fitting Of Radiator Of 08 Mva Power T/Fs By Help Of Craine And As Per Direction Of Supervising Engineer. , Equaliser Pipe Remove Damage Packing And Dry Foum Fixing New Packing. , Replacement Of Oil Level Gauge Damage Glass And Packing. , Filling Of Transformer Oil In The Power T/F After Replacement Of All Required Packing As Per Direction Of Supervising Engineer. , Replacement Of C Phase Bushing Packing Lt Side. , Making Of All Connections Of 08 Mva Power T/Fs As Per Direction Of Supervising Engineer. , Centrifuging Of Power Tf Oil Of 08 Mva. , Making Of All Connections Of 08 Mva Power T/Fs As Per Direction Of Supervising Engineer. , All Packing Set Complete Made Of Cork Sheet For 08 Mva Power T/Fs (Required Material Provided By Contractor At His Own Cost). , Repairing Of Relay Of C&R Pennal. , 10 Mva T/F At 33/11 Kv S/S Saiyan And Kheragarh. , Opening Of All Connections Of 10 Mva Power Tf As Per Direction Of Supervising Engineer. , Drain Out Of Tfs Oil And Store In Drum For Replacement Of Damaged Packing Of 10 Mva Power Tf. , Opening Of 33 Kv, 11 Kv Busing Rod Very Carefully And Removal Of Damage Packing And Replacement Of Packing And Fixing Of 33 Kv, 11 Kv Busing Rod Complete. , Replacement Of Damaged Inspection Cover Packing With New Packing And Fixing. , Radiator Air Release And Balb Seal Replacement. , Opening Of Radiator And Removal Of Damage Packing Fixing Packing Of Radiator And Fitting Of Radiator Of 10 Mva Power T/Fs By Help Of Craine And As Per Direction Of Supervising Engineer. , Equaliser Pipe Remove Damage Packing And Dry Foum Fixing New Packing. , Replacement Of Oil Level Gauge Damage Glass And Packing. (Required Material Provided By Contractor At His Own Cost). , Filling Of Transformer Oil In Ther Power T/F After Replacement Of All Required Packing As Per Direction Of Supervising Engineer. , Centrifuging Of Power Tf Oil Of 10 Mva. , Making Of All Connections Of 10 Mva Power T/Fs As Per Direction Of Supervising Engineer. , All Packing Set Complete Made Of Cork Sheet For 10 Mva Power T/Fs. (Required Material Provided By Contractor At His Own Cost) , Repairing Of Relay Of C&R Pennal.
|