|
Podlesie: Reconstruction Of A District Road On A Section Of 2.055 Km, Demolition Of The Road Structure In Total 452.00 M2, Cutting Down Trees With A Diameter Of 15/55Cm Total 19.00 Pcs. Clearing Bushes 677.00 M2, Demolition Of Culverts With A Diameter Of 100Cm 30.00 M, Disassembly Of Posts And Boards 2 Posts/5 Boards, Construction Of A Trough For The Road Structure And Main Exits. 10/20/35Cm, Total 2313.00M2, Construction Of A Drainage Layer Of Sand, Thickness. 10 Cm 2293.00 M2, Base Made Of Aggregate 0/31.5 Mm Thick. 10/15/20 And 25 Cm, Total 2313.00 M2, Execution Of A Leveling Layer With A Diameter Of Gr. 3 Cm Of Asphalt Concrete 732.00 Tons, Making A Binding Layer Of Asphalt Concrete With A Thickness Of 6 Cm In Total 1431.00 M2, Execution Of The Binding Layer Of Asphalt Concrete, Thickness. 4 Cm, Total Area: 59.00 M2, Making A Wearing Course Thick. 3 Cm Of Ac 8S Asphalt Concrete, Total 11,362.00 M2, Construction Of A Culvert Under The Road From Pehd Pipes With A Diameter Of 100 Cm 3 Pcs., 30.00 M, Construction Of Culverts Under The Exits From Pvc Pipes With A Diameter Of 40 Cm 79 Pcs., 591.00 M, Installation Of Abutments For Culverts With A Diameter Of 40 Cm 158.00 Pcs., Execution Roadsides Made Of Aggregate 0/31.5 Mm, Width 0.75 M 3068.00 M2, Cleaning Of Ditches 2426.00 M, Installation Of Thick-Layer Horizontal Markings In Total 457.70 M2, Installation Of Vertical Markings 11 Posts/16 Boards, Installation Of Sp-04 Protective Barriers 70.00 M, Installation Of Concrete Curbs On The Bench Concrete 12.00 M, Setting Concrete Edges 14.00 M, Making The Surface With Paving Stones Thick. 6Cm 20.00M2, Construction Of Slopes From Aggregate 1412.0M2, Construction Of Slopes From Asphalt Concrete Thickness. 4 Cm 616.00 M2, Regulation Of Manholes 4.00 Pcs. Ratoszyn: Reconstruction Of The District Road On A Section Of 1,530 Km, Demolition Of The Road Structure In Total 663.00 M2, Cutting Down Trees With A Diameter Of 15/55Cm Total 4.00 Pcs. Clearing Bushes 40.00 M2, Demolition Of Culverts With A Diameter Of 60Cm 19.00 M, Disassembly Of Posts And Boards 8 Posts/11 Boards, Construction Of A Trough For The Road Structure And Main Exits. 10/20/35Cm, Total 2268.00 M2, Construction Of Embankments 154.00 M3, Construction Of A Sewage Well With A Diameter Of 50 Cm 3.00 Set, Installation Of Sewer Drains From Pvc Pipes With A Diameter Of 160Mm 20.00M, Making A Drainage Layer Of Sand, Thickness. 10Cm 2131.00 M2, Base Made Of Aggregate 0/31.5Mm Thick. 10/15/20 And 25 Cm, Total 2152.00 M2, Execution Of A Leveling Layer With A Diameter Of Gr. 3 Cm Of Asphalt Concrete 719.00 Tons, Making A Binding Layer Of Asphalt Concrete With A Thickness Of 6Cm In Total 1187.00M2, Making A Binding Layer Of Asphalt Concrete, Thickness. 4 Cm, Total Area: 43.00 M2, Making A Wearing Course Thick. 3 Cm Of Ac 8S Asphalt Concrete, Total 8,507.00 M2, Construction Of A Culvert Under The Road From Pehd Pipes With A Diameter Of 50 Cm 2 Pcs., 20.00 M, Construction Of Culverts Under Exits From Pvc Pip
|