|
Full Site Civil Engineer With Additional Charges, General Manager With Additional Charges, Locksmith With Additional Charges, 6Mm Plywood Sheet Siding, Metal Scaffolding - Assembly And Disassembly, Metal Scaffolding - Supply, Removal Of Rubble With Metal Bucket, Including Manual Loading And Unloading In Boot-Fora, Mechanized Cleaning Of The Land, Including Logs With A Diameter Of Over 15 Cm And Up To 50 Cm, With A Truck Available Within The Work Site, Up To A Radius Of 1 Km, Transport Of Rubble, For Distances Greater Than 10 Km Up To 15 Km, Mechanized Loading And Removal Of Earth, Including Transport Up To 1 Km, Cutting And Compacted Landfill, Supply Of Earth, Inclusive Cutting, Loading, Unloading And Transporting Up To 1Km, Solid Waste Disposal Rate In Landfill, Soil/Earth Type, Retaining Wall With Structural Concrete Blocks And Intermediate Pillars, With A Height Greater Than 2.8 M And Less Than Or Equal To 4.0 M (Except Foundation). Af_11/2024, Mechanical Cleaning Services For Drainage Systems (Galleries, Boca De Lobo, Pv, Etc), Using Combined Hydrojet/Sucker Equipment, Septic Tank Cleaning, Sand Ballast, Crushed Stone Ballast, Fs-07-01 Septic Tank L=4, 80M Useful Vol. = 20, 74M3, Fs-06-01 Septic Tank L=3.00M Useful Vol. = 7.56M3, Manual Excavation In 1St And 2Nd Category Soil In Open Field, Piping Of The Bottom Of Trenches, For Simple Regularization, Concrete Drill - 30Cm Diameter, Manual Excavation For Crowning Block Or Footing (Without Excavation For Placing Formwork). Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 1 Use. Af_01/2024, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Manual Excavation For Baldrame Beam Or Running Shoe (Without Excavation To Place Formwork). Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Insulated Footing Frame, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Assembly And Disassembly Of Formwork For Radiator, Concrete Floor Or Slab On Ground, 4 Uses. Af_09/2021, Frame For Radier Execution, Using Q-92 Screen. Af_09/2021, Slim Concrete Ballast, Applied To Floors, Slabs On Ground Or Radiators, 5 Cm Thick. Af_01/2024, Radier Concreting, Fck 30 Mpa - Laying, Densification And Finishing. Af_09/2021, Separator Layer For Radier Execution, In Plastic Canvas. Af_09/2021, Bd.12 - Asphalt Emulsion-Based Waterproofing - Structured With Polyester Fabric - 2 Layers Of Structuring, Manufacture Of Formwork For Slabs, In Resin Plywood Sheet, E = 17 Mm. Af_09/2020, Shoring Of Slab Formwork In Unprepared Wood, Simple Right Foot, Including Locking, 4 Uses. Af_09/2020, Assembly And Disassembly Of Solid Slab Formwork, 8 Uses. Af_09/2020, Manufacture Of Formwork For Columns And Similar Structures, Assembly And Dismantling Of Formwork For Rectangular Pillars And Similar Structures, Ca-50 Steel Bar Reinforcement (A Or B) Fyk = 500 Mpa, Machined Concrete, Fck = 25 Mpa - For Pumping, Leveling And/Or Protection Mortar, Block Masonry 19 Cm Sealing Concrete - Class C, Common Chapisco - Cement And Sand Mortar 1:3, Common Plaster, Plaster, Ceramic Coating For Internal Walls With Enamelled Dime Type Plates
|