|
Tender For Fabrication And Erection -- 1 Boiler 2 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa,Fd & Id Fans 3 Dismantling, Fabrication & Erection Of Air Heater Outlet Top Plate. 4 Dismantling, Fabrication, Erection Of Ro Water Storage Tanks Canopy And Railing. 5 Dismantling, Fabrication & Erection Boiler Furnace Ash Discharge Hopper 6 Dismantling, Fabrication & Erection Of Air Heater Outlet Bottom Plate. 7 Dismentling , Fabrication Erection Of Rotory Bagasse Feeder Casing 8 Dismentling , Fabrication Erection Of Belt Conveyor Structure 9 Dismantling, Fabrication & Erection Of S.A. Fan Foundation 10 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp, Economizer, Aph 11 Ducting Work With Structure 12 Strengthening Of Ducting Of Boiler. 13 Dismantling, Fabrication & Erection Of F.D. Fan Foundation 14 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 15 Dis, Fabrication And Erection Of F.D. Fan Upper & Lower Casing 16 Dismantling, Fabrication & Erection Of Drum Type Rotary Bagasse Feeder (With Shaft) 17 Dismantling, Fabrication & Erection Of Screw Feeder 18 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 19 Fabrication & Erection Of Man Hole 24”X24” 20 Dis., Fab & Erecting Of Aph Tubes (Replacement) 21 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 22 Fab & Erection Of Fire Fighting Pipe Line Including Valves, Bends, Flange & Support ( Using New Pipeline & Old Drum To Drum Tubes) 23 Travelling Grate Front Side Ash Discharge Plate Dis, Fab & Erection With Structure 24 Fab & Erection Of Travelling Grate Rear Plate Flange (Flange Type ) 25 Fabrication & Erection Of Pneumatic Spreader Assembly From 10 Mm Thk. S.S. Plate With Fabrication & Erection Of Deflector Plate From 20Mm Thk. S.S. Plate With Top & Bottom Flange 26 Dismantling Of Old Pneumatic Spreader Assembly & Internal Deflector Plate 27 Dismantling & Fitting/ Replacement Of Id Fan Impeller 28 Fabrication & Erection Of Id Fan Suction Bend 29 Fabrication & Erection Of Id Fan Suction Cone 30 Fabrication & Erection Of Plate & Spindle Type Damper With Flanges 31 Dismantling, Fabrication & Erection Of Rotary Soot Blower 32 Dismantling, Fabrication & Erection Of Long Retractable Soot Blower 33 Dismantling, Fabrication & Erection Of Economizer L.H.S. & R.H.S From 6 Mm Thk. M.S. Plate With Strengthening From 65 X 65 Angles 34 Fabrication & Erection Of 1.5 Kg/Cm2 Prds, Exhaust & Vapour Pipeline From 10Mm Thk. M. S. Plate 35 Fabrication & Erection Of 1.5 Kg/Cm2 Prds, Exhaust & Vapour Pipeline Drains 36 Dismantling, Overhauling And Fitting 1.5 Kg/Cm2 New Prds(25 Tph) 400 N.B Valve 37 Dismantling, Fabrication & Erection Of New Bagasse Discharge Chute At Return Bagasse Carrier With Gate Arrangement Complete Set In All Respect 38 Fabrication And Erection Of Boiler Outlet/Economizer Hopper 39 Fabrication And Erection Of Water Monitor On Fire Fighting Line 40 Fabrication And Erection Of Fd Fan Suction Cone 41 Replacement Of Travelling Grate Skid Rail 42 Boiling House 43 Platform Work At Various Stations Such As Mill House, Boiler, Turbine, Cranes, Boiling House, C/F House Etc. If Required Anywhere With Structure Strengthening 44 Dismantling , Fabrication & Erection Of Foundation Of Pump & Motor 45 Fitting Of Motor 46 Repairing Of Exhaust Valve 47 Fab & Erection Of Double Filtration System For Quad & Water Inlet Pipe In Pan Condenser. 48 Arrangement For Lifting Of Vaccum Filtered Drums-3 Nos 49 Replacement Of Exhaust And Vapour Valves In The Boiling House. Dis 50 Replacement Of Exhaust And Vapour Valves In The Boiling House Erec- 51 Fabrication Of Electric Motor Cover. 52 Strengthening Of Vapour Pipe Inside & Outside With Angle Iron Rings/ M.S.Plate. 53 Manhole Work In Vapour Pipes/Headers 54 Modification In Bagacillo Chimney 55 Replacement Of Vapour Pipe. A) Dis 56 Replacement Of Vapour Pipe. B) Fab 57 Replacement Of Vapour Pipe. C) Ere 58 Exhaust And Injection Pipeline A) Dis 59 Exhaust And Injection Pipeline B) Fab 60 Exhaust And Injection Pipeline C ) Ere 61 Replacement Of V.Pipe Bends Dis 62 Exhaust & Injection Bends Fab- 63 Exhaust & Injection Bends Erec. 64 Dis,Fab & Ere Of Final Molasses Pipeline 65 Dis,Fab & Ere Of Suction Pipe For Injection, Ct Pump 66 Fab & Erection Of M.S. Vessels, Square & Rectangular Tank 67 Increase Of Shell Height With All The Fitting And Accessories Work. 68 Dis, Fab & Erection Of M.S.Plate Work 69 Dis,Cleaning & Ere Of Pipeline (Juice, Massecuite, Srrup, Molasses Etc) 70 Dis,Fab & Ere Of Coil(Water,Juice,Ammonia,So2Etc) 71 Fab And Erection Of Motor Bed 72 Dis,Fab & Ere Of Nrv For Injection, Turbine, Spray Etc 73 Saveall Of Pan,Quad Dis 74 Saveall Of Pan,Quad Fab 75 Saveall Of Pan,Quad Ere 76 Unloading Of Material From Truck (Ms, Ss, Ci, Acc Etc) 77 Dis, Fab & Ere Of Jay Pipe 78 Fitting Of Baffle Plates 79 Dismantling, Fabrication & Erection Of Belt Conveyor Structure 80 Clarifier Coil Work A) Dismantling 81 Clarifier Coil Work (B) Fabrication 82 Clarifier Coil Work ( C) Erection 83 Dismantling, Fabrication & Erection Of Perforated M.S Plates Of Direct Contact Juice Heaters. 84 Dismantling , Fabrication & Erection Of Strainers Of Injection, Spray , C.T Pumps. 85 Dismantling, Erection (With Alignment) Of Planetary Gear Box Of Crystallizers. 86 Nozzles Of Spray Pond, Condenser. 87 Dismantling (Each Nozzle) 88 Fitting (Each Nozzle) 89 Replacement Of Double Beat Valve 90 Dismantling , Fabrication & Erection Of Exhaust Valve Casing 91 Opening & Fitting Of Juice Heater Covers 92 Dismantling & Fitting Of S.S Tubes In Juice Heater & Evaporator Body 93 Dismantling, Fabrication & Erection Of Mud Mixture Conveyor 94 Dismantling, Fabrication & Erection Of Mud Mixture Casing 95 Dismantling, Fabrication & Erection Of Down Take Umbrella Of Pan 96 Replacement Of 3’’ Coil Of Vertical Crystallizer 97 Gutter Work (Bigger Side Will Be Treated As Dia.) 98 Gutter Work Dismantling 99 Gutter Work Fabrication 100 Gutter Work Erection 101 Jammed Tube Falling Film Evaporator 102 Replacement Of Sluice Valve 103 Fabrication / Strenghting Of Beam, Vessel, Pipe, Channel, Angle Etc. 104 Dis, Fabrication & Erection Of 7 Kg/Cm2 Prds Pipeline 105 Dis, Fabrication & Erection Of 7 Kg/Cm2 Prds Pipeline Drains 106 Replacement Of Readymade Bend 107 Replacement Of Ammonia Pipe Of Pan & Quad 108 Replacing Of Worn Out Brass Zig Zags & S.S Screens Of Vacuum Filter 109 Dismantling, Fabrication & Erection Of M.S Plate ( As Required) 110 Dismantling Of Existing Syrup Sulphitor & Shifting To Scrap Yard 111 Dis., Fab & Erection Of Save All Cone Of Evaporator And Pans 112 Dismantling, Installation And Alignment Of Reduction Gear Box. 113 Dismantling, Fab & Erection Of Agitator 114 Fitting & Replacement Of Batch Type Machine 115 Fitting & Replacement Of Continuous Type Machine 116 Replacement Of Exhaust Balloon 117 Replacement Of Savall Of Quad And Pan 118 Replacement Of Screw Type Arm Of Crystallizer 119 Replacement Of Drive Of Vertical Crystallizer 120 Replacement Of Tube Of Quad And Juice Heater 121 Dis, Fab. & Erection Of Foundation For Clarifier Drive 122 Dismantling, Fabrication & Erection Of Cover Of S400 Semi-Kestner 123 Replacement Of S.S. Pipelines Including Pipe Fittings 124 Replacement Of Seamless Pipeline Including Pipe Fitting 125 Replacement Of Magma Mixer With Arm, Bracket & Gear 126 Dismantling, Fabrication & Erection Of Underground S.S. Pipeline For Condensate Water 127 Dismantling, Fabrication & Erection Of Cone As Per Requirement 128 Modification Of Bagasscillo Cyclone 129 Dismantling, Fabrication, Assembly And Trial Of Mechanical Circulator 130 Modification In Exhaust & Vapour Valve 131 Dismantling, Fabrication & Erection Of Spray Pond Header 132 Dismantling, Fabricaton & Erection Of Basket Housing Cover & Bottom Discharge Chute Of Centrifugal Machine 133 Dismantling, Fabrication & Erection Of Arms Of Clarifier 134 Dismantling, Fabrication & Erection Of Down Tape Of Evaporator Bodies 135 Fabrication & Erection Of Molasses Jacket For Batch Type C/F M/C 136 Hydraulic Testing Of Vertical Crystallizers Complete In All Respects 137 Dismantling, Fabrication & Erection Of Various Stations For Entrainment Catcher 138 Dismantling & Installation Of Super Heater In Boiling House 139 Dismantling & Installation Of Oil Cooler At Turbine 140 Dismantling, Fabrication & Erection Of All High Pressure Line Drains At Turbine 141 Replacement Of Cut Over Valve For Pan 142 Modification Work In Juice Line Below Quad Station 143 Dis., Fabrication & Erection Of Grit Conveyor 144 Dis., Fabrication & Erection Of Sugar Hopper 145 Dis., Fabrication & Erection Of M.S. Tank/Vessel 146 M.S. Pipeline Replacement 147 Dis., Fabrication & Erection Of Vapour/ Exhaust Line From Quad To Pan Station 148 Dismantling And Fitting Vapour/Exhaust Valve 149 Dismantling, Fabrication & Erection Of Bagassecillo Line 150 Dismantling, Fabrication & Erection Of Underground & Outside Pipeline Of All Sizes 151 Boiler/Turbine, Cooling Tower Sugar Godown/Workshop/Store/Cane Unloader & Factory 152 Fab & Erection Of Gate 153 Strengthning Of Tress Beams,Vessel,Pipe With Channel,Angle,Pipe Etc Any Where 154 Fab & Erection Of M.S.Stair/Ladder Single Story 155 Fab & Erection Of M.S.Stair/Ladder Double Story 156 Dismantling, Fabrication & Erection Of Underground And Outside Pipeline Of All Sizes 157 Fabrication & Erection Of Nrv Of Ct Pump 158 Dismantling, Fabrication & Erection Of Turbine Silencer 159 Dismantling, Fabrication & Erection Of Cooling Tower Pipeline From Cooling Tower Of Turbine 160 Misc .Items. 161 M.S Pipeline Per Inch Dia//Ft/Length (A ) Dismentling Of Pipe Line. 162 Upto 1” Dia To 12’ Dia. 163 Above 12” 164 Fabrication Of Pipe Line From M.S.Plate Or Ready-Made Pipe Any Dia. 165 Erection Of Pipe Line Per Inch Dia/Ft/Length (I) Upto 1’ Dia To 166 Erection Of Pipe Line Per Inch Dia/Ft/Length (Ii. Above 12” Dia 167 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. (Per Inch Dia/Ft/Length ) (A) Upto 1”Dia To 12” Dia 168 M.S.Pipe Accessories Work, Dismantling Of Bends, Tee, Reducder, Cross, Elbow, Nipple, Nozzle, Flanged, And Bends. (Per Inch Dia/Ft/Length (Ii.) Above 12” Dia. 169 Fabrication Of Bends, Tee, Reducer Etc.-(P.Inch Dia/Ft) (I) Upto 1”Diato 12” Dia 170 Fabrication Of Bends, Tee, Reducer Etc.-(P.Inch Dia/Ft) ( Ii) Above 12\ Dia.. 171 Erection Of Bends, Tee Etc.(Per Inch Dia/Ft/Length) (I) Upto 1” Dia To 12” Dia 172 Erection Of Bends, Tee Etc.(Per Inch Dia/Ft/Length) Ii) Above 12” Dia 173 Valve Work 174 Dismantling Of Valves, (Per Inch Dia/Pc) Upto 1” Dia To 12” Dia 175 Dismantling Of Valves, (Per Inch Dia/Pc) Above 12” Dia 176 Erection Of Valve 177 Dismantling Of Valves ,(Per Inch Dia/Ft/Length) (I) Upto 1” Dia To 12” Dia 178 Dismantling Of Valves ,(Per Inch Dia/Ft/Length( Ii) Above 12” Dia 179 Plateform Work (Per Sft) 180 I) Dismantling 181 Ii) Fabrication And Erection 182 A) Patch Work With Old Material. 183 B) Patch With New Material . 184 Purling In Work.(Per Rft) (I) Dismantling 185 Fabrication & Erection 186 Cutting Of Old Flange Repairing For Reuse & Fitting 187 Dis, Fabrication And Erection Of Distance Piece 188 Mill House 189 Replacement Of Ms Plate Work, Weak Portion Of Cane Carrier, Chopper, Leveller, Fibrizer, Bagasse Elevator, Mbc,Rbc,Bc Etc A) Dismantling 190 Replacement Of Ms Plate Work, Weak Portion Of Cane Carrier, Chopper, Leveller, Fibrizer, Bagasse Elevator, Mbc,Rbc,Bc Etc B) Fabrication 191 Replacement Of Ms Plate Work, Weak Portion Of Cane Carrier, Chopper, Leveller, Fibrizer, Bagasse Elevator, Mbc,Rbc,Bc Etc C) Erection 192 Hc Flat Replacement Angle, Beam & Channel. 193 Dismantling, Fitting & Alignment Of C-Channel & Teflon Runner Of Rake Carriers . 194 Fabrication & Erection Of Trpf Cover 195 Dismantling, Fabrication & Erection Of Guide(Salami) 196 Dismantling, Fabrication & Erection Of Trough Of Bagasse Carriers 197 Dismantling, Fabrication & Erection Of Bagaescillo Pipe 198 Fabrication & Erection Of Discharge Chute 199 Dismantling, Fabrication & Erection Of Be,Mbc & Rbc Trough 200 Dismantling, Fabrication & Erection Of Be,Mbc & Rbc Side Plate 201 Dismantling, Fabrication & Erection Of Discharge Chute Of Mbc Belt Conveyor 202 Dismantling, Fabrication & Erection Of Foundation Bed Of Pump, Motor, Gear Boxes 203 Fabrication & Erection Of Weak Portion Of Cane Unloader Bridge, Trolley Etc 204 Dismantling,Fabrication & Erection Of Square Bar Of Cane Unloader 205 Dismantling Of Old Rotary Screen Between Mill 1 & Mill 2. 206 Modification In The Mbc Chain As Per New Rbc Belt System. 207 Dismantling Of Complete Rbc Structure. Please Enable Macros To View Boq Information
|