|
Tender For Supply Of Following Items - 1) O/H & Stamping Of Weighbridge, Weigh Scale 2) Reshelling Of Mill Roller 3) O/H & Servicing Of Mill Lubrication System 4) O/H & Servicing Of Mill Hydraulic Cap & Hydraulic System 5) Ultrasonic, Dp Testing, Stress Relieving, Thickness Gauging 6) Shifting Of Rotary Screen 7) Supply & Fitting Of Mech. De Hooking System To Existing Cane Unloader 12.5 M.T. 8) Replacement Of Swing Type Leveler To Fixed Type Leveler 9) Planetary Gear Box O/H & Maintenance 10) Both Feeder Table Modification Work 11) O/H & Servicing Of Mill Make Elecon Planetary Gear Box. & Replacement Of 1St Stage Of Planetary Gear Box 12) Dismantling, Fabrication And Erection Of Platform, Piping Railing At Various Sections In Factory 13) Conversion Of G. M. Bearing, Bushes Etc. 14) O/H Servicing And Re-Commissioning Of Various Turbine, With Gear Box 15) Re-Blading Of Rotor Of 2.5 Mw Triveni Make 14A Power Turbine 16) Design, Supply, Erecting, Commissioning Of Double Trolley 10 Mt Capacity Hand Operating Crain 17) Testing Of Pressure Vessels, Lifting Tools & Tackles With Authorized Test Certificate As Per Factory Inspector Rules 18) In Situbalancing Of Leveler, Chopper, Fibrizer, Various Fans Of Boiler, C/F M/C, Blower 19) Dynamic Balancing C/F M/C Basket. 20) O/H & Servicing Of Ksb Boiler Feed Pumps 21) Shifting Of Old Inlet Stem Line Of 2.5 Mw Triveni Make 14A Turbine With Ibr Formalities 22) Jet Cleaning Of Boiler No. Mr-10403, Mr-10404, Mr-11228. 23) Ibr Work Of Boiler No. Mr-10403, Mr-10404, Mr-11228 As Per Instruction Of Boiler Inspector 24) Overhauling Of Safety Valves Of Boiler And Trial At Load (Safety Valve Re-Setting) 25) Replacement Of Air Heater Tubes Of Boiler No. Mr-11228 26) Ibr Piping Of Instruments Of Boiler No. Mr-10403,10404,11228. 27) Oil Filtration Of Turbine Oil & Transformer Oil Earth Test Certificate. 28) O/H & Servicing Of Hydraulic System For Pan Discharge Valve, Outlet With Power Pack 29) Recondition Of Juice Heater Top & Bottom Cover. 30) Recondition Of Vacuum Filter Size: 8X16. 31) Supply Of Frp Pipe For Sulphur Gas Line. 32) Shifting Of A Heavy Diluter. 33) Insulation, Lagging, Cladding Of Steam / Vapour Line As Per Requirement. 34) Dismantling, Supply, Erection Of Spray Main Header. 35) Outside Chemical Cleaning Of 4 Nos. Quadripal Bodies. 36) Overhauling & Amcmc Ofof Boiler Instrumentation. 37) Overhauling & Amc Of Acfc. 38) Overhauling Of Various VfdS In Our Plant. 39) Amc Of Air Conditioning System. 40) PrdS Automation Work. 41) Supply, Fitting, Erecting, Commission Of Iris Valve For, C/F M/C. 42) Plc Upgradation Of Sugar Batch Type C/F M/C. 43) O/H & Servicing Of Mass Weighing M/C. 44) O/H & Servicing Of Chicago Pneumatic Air Compressors. 45) O/H & Re-Commissioning Of 2.5 Mw Turbo Alternator. 46) O/H & Servicing Of Various AcbS. 47) O/H & Servicing Of Avr & Testing Of Relay, Metering Of 2.5 Mw Alternator - 2 Set. 48) O/H & Servicing Of Harmonic Panel -2 Set. 49) O/H & Servicing Of Electrical Motors. 50) Repairing & Overhauling Of Ae Make 500 Kva Voltage Stabilizer. 51) Retrofitting Of 2.5 Mw Jyoti Make Alternator Main Acb-Existing 3200 Amp Required 4000 Amp., 3 Pole -2 Nos. With Rewiring Of Panel. 52) Rewinding Of Various Motors.
|