|
Local Administration, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af03/2022Ps, Shed For Medium-Size Works Reuse 2 Times, Electricity Input, Overhead, Three-Phase, With Overhead Box, 25 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af07/2020Ps, Auxiliary Post For Power Input, Three-Phase, In Galvanized Iron D=3 And H=6, 0M, Complete, 1000 L Polystylene Tank, Incl. Wooden Support Of 7X12cm And 8X7cm, Elevated 4M, Demolition Of Pavement, Mechanized With Reuse, Horizontal Excavation, Including Loading And Unloading In 1St Category Soil With Crawler Tractor (170Hp/Blade: 5, 20M3). Af07/2020, Execution And Compaction Of Landfill With Predominantly Clay Soil - Excluding Soil, Excavation, Loading And Transport. Af11/2019, Loading, Maneuvering And Unloading Soil And Granular Materials In A 14 M³ Dump Truck - Loading With Hydraulic Excavator (1.20 M³ / 155 Hp Bucket) And Free Unloading (Unit: M3). Af07/2020, Transport With 14 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af07/2020, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af07/2020, Paving Rental. Af03/2024, Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af11/2019, Construction Of Base And Sub-Base For Paving With Reuse Of Existing Cobblestone, Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Cargo And Transport. Af11/2019, Load Of Asphalt Mixture In Dump Truck 6 M³ (Unit: T). Af07/2020, Transport Of Hot Bituminous Mixture With Truck With 6 M³ Thermal Bucket - Paved Highway, Execution Of Connecting Asphalt Painting, Including Supply Of Binder, Exclusive Transport, Transport With 30,000 L Asphalt Material Transport Tank Truck, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af07/2020, Guide Laying (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length X Lower Base X Upper Base X Height). Af01/2024, Laying Of Guide (Curb) In Curved Section, Gutter Or Gutter Molded On Site, Type Pmsp In Concrete With Fck 20 Mpa, Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of 10 Cm. Af01/2024, Execution Of Walkway (Sidewalk) Or Concrete Floor With Concrete Molded In Place, Machined, Conventional Finish, Thickness 6 Cm, Reinforced. Af08/2022, Accessibility Ramp In Concrete Cast In Place, On New Sidewalk With A Width Less Than 3.00 M, Fck Mpa, With Podotactile Floor. Af03/2024, Application Of Plastic Tarpaulin For Execution Of Concrete Floors. Af04/2022, Elevated Crossing Lane For Pedestrians - Lombofaixa - Rcn - Platform Dimensions 9.31 (60X60cm) With 3.50M Wooden Post Fixed With 40X40x50 Concrete Base, Including Labor - Rev 01/2023, 20X35 Sign On Enamelled Sheet For Identification Of Public Places, Painting Of Pedestrian Crossings Or Epoxy Paint, E = 30 Cm, Manual Application. Af05/2021, Street Cleaning (Sweeping And Removing Debris)
|