|
Revitalizacao Da Orla - Sinapi 103689- Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Revitalizacao Da Orla - Sinapi 99059. Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af-03/2024, Revitalization Of The Waterfront - Mechanized Cleaning Of Vegetation Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Waterfront Revitalization - Chemical Bathroom Rental, With 03 Weekly Cleanings-10389/Orse, Waterfront Revitalization - Sicro 5915361- Transport On Mechanical Horse With 5 And 4 Axle Trailers With 130 T Capacity - Paved Highway, Waterfront Revitalization - Sinapi 2706 Junior Civil Engineer (Hourly), Waterfront Revitalization - 90781-Surveyor With Additional Charges, Waterfront Revitalization - Sinapi 101136 Horizontal Excavation, Including Loading, Unloading And Transport On 1St Category Ground With Crawler Tractor (170Hp/Blade: 5, 20M3) And Dump Truck Of 10M3, Dmt Up To 200M. Af_07/2020, Waterfront Revitalization - Sinapi 93589 Transport With 10 M Dump Truck, On Urban Road With Primary Coating (Unit: M3xkm). Af_07/2026, Revitalization Of The Waterfront - Sinapi101230 Vertical Excavation For Infrastructure, With Loading, Unloading And Transport Of Soil Of 1 Category, With Hydraulic Excavator (Bucket: 0.8 M / 111 Hp), Fleet Of 3 Dump Trucks Of 14 M, Dmt Up To 1 Km And Average Speed14 Km/H. Af_05/2020, Waterfront Revitalization - Transport With 10 M Dump Truck, On Urban Road With Primary Coating (Unit: M3xkm). Af_02/2026, Revitalization Of The Waterfront - Sinapi 105565 Execution And Compaction Of The Final Layer Of Landfill (100% Of Normal Proctor Energy) With Predominantly Sandy Soil, In Layers 20 Cm Thick - Excluding Excavation, Loading And Transport And Soil. Af_09/2024, Waterfront Revitalization - Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (0.8 M3), Width. From 1.5 M To 2.5 M, On 1St Category Soil, Locations With Low Levels Of Interference. Af_09/2024, Edge Revitalization - 92801- Cutting And Bending Of Ca-50 Steel, Diameter Of 6.3 Mm. Af_06/2022, Edge Revitalization - 92802 - Cutting And Bending Of Ca-50 Steel, Diameter Of 8.0 Mm. Af_06/2022, Edge Revitalization - 92803- Cutting And Bending Of Ca-50 Steel, Diameter Of 10, Edge Revitalization - 92804- Cutting And Bending Of Ca-50 Steel, Diameter Of 12.5 Mm. Af_06/2022, Edge Revitalization - 92805- Cutting And Bending Of Ca-50 Steel, Diameter Of 16, Edge Revitalization - 92800- Cutting And Bending Of Ca-60 Steel, Diameter Of 5, Edge Revitalization - Sinapi 100349 Concreting Of Containment Curtain, Through Pump - Launching, Thickening And Finishing. Af_11/2024, Revitalizacao Da Orla - Sinapi 100341 - Manufacture, Assembly And Disassembly Of Form For Retaining Curtain, In Plasticized Plywood Sheet, E = 18 Mm, 10 Uses. Af_11/2024, Waterfront Revitalization - Sianpi 102722- Drain In Retaining Wall, Executed At The Foot Of The Wall, With Perforated Flexible Corrugated Hdpe Tube, Filled With Crushed Stone, Wrapped With Geotextile Blanket. Af_07/2021, Waterfront Revitalization - Sinapi 101176. Concrete Drill Stake, 30Cm Diameter, Manual Excavation With Auger, With Starter Reinforcement, Edge Revitalization - Sicro E9526- Tire Backhoe - Loader Bucket Capacity Of 0.76 M And Da 0.29 M Backhoe Loader -
|