|
Local Administration - Technical Hours Engineer, Foreman And Occupational Safety Technician, Siding With Metallic Tile. Af_03/2024, Percussion Survey With Standard Penetration Test (Spt), Diameter 2.1/2, Exclusive Mobilization And Demobilization, Mobilization And Demobilization Of Percussion Survey Equipment With Standard Penetration Test (Spt) (Fixed Cost), Demolition Of Masonry For Any Type Of Block, Mechanized, Without Reuse. Af_09/2023, Demolition Of A Simple Concrete Floor, Mechanized Using A Hammer, Removal Of Fencing For Sports Courts, Structured By Galvanized Steel Tubes, With Galvanized Wire Mesh, Manually, Removal Of Light Fixtures, Manual Removal Of Metal Frames, With Reuse, Including Frame/Alizar/Trims, Removal And Stacking, Including Transportation And Removal Of Non-Reusable Removed Material, Removal Of Fences And Posts, Mechanized Demolition Of Concrete, Without Frames, With Pneumatic Equipment, Including Removal And Stacking, Exclusive Transportation And Removal Of Demolished Material, Removal Of Class A Debris (Masonry, Concrete, Mortar And Ceramics) By Pipeline Debris And Final Packaging In Stationary Bucket. Excluding Shipping. Af_09/2025, Manual Excavation For Crowning Block Or Footing (Including Excavation For Placing Formwork). Af_01/2024, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Manual Piping At The Bottom Of A Trench With Socket, Excavation Exclusive, Lean Concrete For Ballast, Mixture 1:4, 5:4, 5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021, Manufacture, Assembly And Dismantling Of Formwork For Shoe, In Lumber, E=25 Mm, 4 Uses. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Insulated Footing Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concreting Footing, Fck 30 Mpa, Using Pump - Laying, Densifying And Finishing. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Manufacture Of Formwork For Pillars And Similar Structures, E=25 Mm. Af_09/2020, Manufacture Of Formwork For Beams, In Resin Plywood Sheet, E = 17 Mm. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Slab Frame Of Conventional Reinforced Concrete Structure Using Steel Ca-60 Of 5, Slab Frame Of Conventional Reinforced Concrete Structure Using Steel Ca-50 Of 6, Slab Frame Of Conventional Reinforced Concrete Structure Using Steel Ca-50 Of 8, Slab Frame Of Conventional Reinforced Concrete Structure Using Steel Ca-50 Of 1
|