|
.Supply And Placement Of Work Sign Made Of Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats, Manual Demolition Of Ceramic Brick Or Concrete Block Masonry, Including Removal And Stacking, Excluding Transport And Removal Of Demolished Material, Manual Demolition Of Granite/Marble Floor, Manual Removal Of Wooden Frame Or Metallic, With Reuse, Exclusive Transport And Removal Of Non-Reusable Removed Material., Rental Of Container With Thermal Insulation, Type 1, For Construction Office, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Usable Height, Including Air Conditioning And Internal Electrical Connections, Exclusive Mobilization/Demobilization And External Temporary Connections., .Executive Architectural Project, .Executive Project Of Electrical Installations, .Executive Project Of Hydro Sanitary Installations, .Mobilization And Demobilization Of Work In An Urban Center Or Bordering Region With A Value Of Up To 1,000,000.00, .Land Cleaning, Including Weeding, Raking Up To Twenty (20) Meters Apart And Controlled Burning, Manual Regularization And Mechanized Land Compaction With Vibrating Plate, Exclusive Deforestation, Removal, Land Cleaning/Mowing, Topographic Location For Up To Twenty (20) Reference Points, Including Marking Stake, Manual Drilling Of Type Stake Auger Drill, Including Spacing, Excluding Frame, Structural Concrete, Transport And Removal Of Excavated Material,.Supply Of Structural Concrete, Prepared On Site With A Concrete Mixer, With Fck 25Mpa, Including Laying, Thinning And Finishing (Foundation)., ...Cutting, Bending And Assembly Of Ca-50 Steel, Diameter (6.3Mm A 12.5Mm), Including Spacer, ..Manual Excavation Of Trench With A Depth Greater Than 1.5M And Less Than Or Equal To 3.0M, Including Side Discharge, ..Manual Ground Regularization And Compaction With Socket, ..Lean Concrete Ballast, E = 3 Cm, Fck=10Mpa, Mechanical Preparation, Launch Included And Density. (Bottom Of The Blocks), ...Supply Of Structural Concrete, Densification And Finishing (Foundation), Including Spacer..., Including Lateral Unloading., ...Regularization And Compaction Of Manual Land With Socket, Including Launching And Densification. (Bottom Of Trenches), Forming And Unshaping Of Board And Batten, Reuse (3X) (Foundation), Cutting, Including Spacer),..Supply Of Structural Concrete, With Fck 25 Mpa, Densification And Finishing (Foundation, Reuse (3X), Excluding Shoring), Supply Of Structural Concrete, Prepared On Site, Densification And Finishing - (Structures).), Including Spacer)., Excluding Propping., Thickening And Finishing - (Structures).)), Including Spacer)), Unidirectional Pre-Molded Slab With Expanded Polystyrene Filling (Eps), 4Cm Capping, 100Kg/M2 Overload, Total Height 11Cm And Maximum Free Span Of 5M, Including Structural Concrete, Machined Pumped With Fck Of 20Mpa, Exclusive Reinforced Mesh And Cramping, Metal Shoring For Slab And Beam In Reinforced Concrete, Type B, Height Of (311 To 450)Cm, Including Unloading, Assembly, Disassembly And Loading.,..Linter And Counter-Verge Molded In-Situ For Openings, With Four 8Mm Steel Bars, 5Mm Stirrup Every 15Cm.., Ved Masonry
|