Hydrogeological/Geophysical Study To Define The Drilling Point., Request For Prior Consent For Drilling+Art Crea, Use Grant Process, Physical?Chemical/Bacteriological Analysis Of Water And Rates., Conclusive Technical Report With Final Art., Transport And Mobilization Of Machinery., Assembly Of Drilling Equipment., Power Generator With Generator Group Up To 60Kwa., Drilling In #6 In The Rock From 200 To 150 Meters., Drilling In #6 In The Rock From 150 To 200 Meters., Drilling In #6 In The Rock From 200 To 250 Meters., Drilling In #6 In The Crack From 250 To 300 Meters., Lining In Carbon Steel 6 Din 2440, Cementing Of The Ring Space And Sanitary Protection Slab/Base., Well End Cover In Steel Plate 6., Development And Cleaning Of The Well., Flow Test With Submersible Pump., Complete Three-Phase 4 Hp Submersible Pump., Complete Three-Phase 5 Hp Submersible Pump., Complete Three-Phase 6 Hp Submerged Pump., Single-Phase 3 Hp Submersible Pump Complete., Complete Single-Phase 4Hp Submersible Pump., Complete Single-Phase 6Hp Submersible Pump., Complete Control Panel 2, 5/3, 0 Three-Phase 220V Cv., Complete Rural Single-Phase Control Panel 254., Winch Service For Installation Of Equipment Up To 300 Meters., Pvc Eductor Tube 1.1/4, Pvc Eductor Tube 1.1/2, Galvanized Tube 1.1/2, Geomechanical Tube 1.1/2, Galvanized Tube 1.1/4, Geomechanical Tube 1.1/4, Galvanized Bend 1.1/2, Galvanized Bend 1.1/4, Galvanized Iron Sleeve 1.1/4., Galvanized Iron Sleeve 1.1/2., Well End Connections., Pp Conductor Cable 1Kva 3 X 2.5Mm., Pp Conductor Cable 1Kva 3 X 4 Mm., Pp Conductor Cable 1Kva 3 1Kva 3 X 25 Mm., Well Protection Head., Electromechanical Time Programmer Rtm 220V 60Hz Coel
|