|
Tender For Rate Contract For Repair Of Main Roads In Township Scope Of Work (Sow) As Mentioned In Tender And Schedule Of Work( 45 )Items As Given Below ,[1] Scrapping,Moorum Over Wbm Surface 100.000 M2,[2] Earth Wrk,Box Cutg,175M 1400.000 M3,[3] Dressing And Chilchalling Road Flanks 100.000 M2,[4] Disposal,Debris 1000.000 M3,[5] Lay Bitumin Macadam,Hotmix Plnt,15-20Tph 1250.000 M3,[6] Layg Thk20Mm Premix Carpet,Hotmix Palnt 84000.000 M2,[7] Layg 6Mm Nominal Thick Premix Carpet 84000.000 M2,[8] Layg Tack Coat,Wbm Surface,4Kg/10M2,M/C 20100.000 M2,[9] Providing & Laying Tack Coat Over Wbm 5000.000 M2,[10] Layg Tack Coat,Wbm Surface,3Kg/10M2,M/C 84000.000 M2,[11] Providing & Laying Tack Coat Bituminous 168000.000 M2,[12] Supply,Sand Including Spreading 250.000 M3,[13] Supply Of Moorum Including Stacking 20.000 M3,[14] Labour F/Spreading Moorum To Proper Lvl 20.000 M3,[15] Supply Approve Quality Stone Metal&Stack 600.000 M3,[16] Applg,Thermoplastic Paint 3600.000 M2,[17] Instln 3M Microprismatic Lens Cats Eye 3000.000 Ea,[18] Scrapping, Cleaning Etc. 50000.000 M2,[19] Supply Approved Quality Slag Metal&Stack 180.000 M3,[20] Extra Over Premix Carpet For Plastic Use 21000.000 M2,[21] Extra Over Seal Coat For Plastic Use 21000.000 M2,[22] Supply And Installation Of Bumps 70.000 M,[23] Dismantling Of Brick Work 5.000 M3,[24] Disman Of Pcc 5.000 M3,[25] Disman,Rcc 5.000 M3,[26] Prvdg&Placing,Steel Reinf 2.000 To,[27] Rcc,W/Down Stone Chips,1:1.5:3 10.000 M3,[28] Flyash Br Wrk,230Mm,M7.5,Super Sturcture 5.000 M3,[29] Plaster,Cement Mortar,Thk12Mm 50.000 M2,[30] Nmnl Mix,M-15 Cc W/Grd Stone,F/Basement 5.000 M3,[31] Ctrld Cc Grd M30 Mix,Gnd Flr 20.000 M3,[32] Supply,Hume Pipe,Dia300Mm 5.000 M,[33] Prvdg,Layg,Jtng,R.C.Hume Pipe,450Nb 5.000 M,[34] Supply,Hume Pipe,Dia500Mm 5.000 M,[35] Microsurfacing Type-Ii 7000.000 M2,[36] Microsurfacing Type-Iii 3500.000 M2,[37] Providing And Laying 25Mm Thick Mastic 10500.000 M2,[38] Providing And Laying Dense Graded Bm 1260.000 M3,[39] Providing And Laying Bituminous Concrete 940.000 M3,[40] Providg Bituminous Concrete With Plastic 300.000 M3,[41] Wet Mix Macadam Base Course 630.000 M3,[42] Labour For Spreading Stone 630.000 M3,[43] Labour For Spreading Slag Metal 189.000 M3,[44] Sweeping,Road Mechanically 10500.000 M2,[45] Prvdg,Shuttering 200.000 M2
|