|
1. The Subject Of The Order Is The Provision Of Services For The Operation And Removal Of Failures Of Street, Park And Illumination Lighting In Tarnów On The Network Owned By The Tarnów City Commune And Includes The Following Activities: 1) Conducting 24-Hour Duty (Also On Days Off, Sundays And Holidays), Consisting Of: A) Daily Monitoring Of Information From The Cpanet System Monitoring The Operation Of Street Lighting, B) Receiving Reports Of Failures And Damage To Lighting, C) Securing The Place Of Occurrence Failures And Devices Until Repair, Removing Threats Resulting From Damage To Lighting And Protecting Elements Against Further Damage, D) Removing Failures And Damages Not Covered By The Scope Indicated In The Detailed Description Of The Subject Of The Order (Annex No. 1 To The Swz) And In The Draft Provisions Of The Contract (Annex No. 2 To The Swz), 2) Performing Activities And Fulfilling Obligations Specified In The Operating Manual, In The Parts Referred To Below: A) General Rules For The Operation Of The Street Lighting Network, B) Rules For The Ongoing Operation And Maintenance Of Street Lighting, Excluding Group Replacement Of Light Sources, Checking The Foundation And Restoring The Verticality Of Poles, Securing And Supplementing The Foundations Of Lanterns, Supplementing The Numbering Of Poles, Painting The Pole Shafts With Anti-Corrosion Paint. The Above-Mentioned Excluded Activities Are Included In The Scope Specified In The Detailed Description Of The Subject Of The Order (Annex No. 1 To The Swz) And In The Draft Provisions Of The Contract (Annex No. 2 To The Swz), C) List Of Activities Related To The Operation Of Street Lighting Devices In Normal Operation Conditions - Inspection And Ad Hoc Works, 3) Starting Street Lighting After Failures, 4) Replacing Damaged Elements Of The Power Supply And Control System And Fuses, 5) Removing Lighting Faults, Incl. Including: Eliminating Short Circuits On Lighting Fixtures, Switching On Circuit Protections, 6) Maintaining Lighting Cabinets, Including Repairing Cabinets After Damage, 7) Identifying The Causes Of Failures, Inspection And Checking Activities On Power Reducers, Controllers, Lighting Cables, Fixtures, 8) Creating And Maintaining Visual Inspection Logs, Facility Books And A Log Of Ad Hoc And Emergency Works, Which Will Describe All Activities Resulting From This Contract (Together With The Specification Of The Device On Which Where The Work Was Performed). Templates Of The Facility Book, Inspection Log And Ad Hoc And Emergency Work Log Are Attached To The Operating Instructions,9) Ensuring Constant Wireless Communication In The Gprs System To Cpanet Control Cabinets, Ensuring The Correct Operation Of The System From The Physical Side In The Field, Including Replacing Batteries In The Controllers (The Contractor Does Not Bear The Costs Of Subscription Fees For Controllers And Server Maintenance Costs),10) Making The Network And Street Lighting Devices Available To Other Contract
|