1. The Subject Of The Order Is: Modernization Of The Fence And Gate System At Ul. Augustyńskiego 1 In Gdańsk. The Works Will Include Demolition, Construction And Assembly Works. The Total Length Of The Planned Fence Is Approximately 210 Meters (Running Meters). The Scope Of Work Will Include: - Carrying Out Actual Measurements And Markings In The Field Before The Commencement Of Works; - Preparatory And Demolition Works, Including The Demolition Of The Old Garbage Shelter At The Entrance; - Presentation Of Documentation And Samples Of Materials Planned For The Construction Of The Fence And Gates And Wickets Before The Commencement Of Works, In Order To Agree And Accept The Patterns By The Ordering Party; - Construction Of A Panel Fence With A System Gate In Green, With A Fence Length Of Approximately 160 M; - Construction Fence Made Of Decorative Panels With A Gate, Made Of Black Expanded Metal, Approximately 42 Meters Long; - Installation Of Two Gates And One Wicket, Double-Leaf Metal Gates, Galvanized In Black, With The Coat Of Arms Of The Pomeranian Voivodeship; - Changing The Location Of The Existing Barrier With The Installation Of A Lantern; - Tidying Up The Area After Completion Of The Works.2. The Order Must Be Completed In Accordance With The Requirements Contained In: Description Of The Subject Of The Order Constituting Annex No. 1.1 Of The Swz, And In The Contract Template Constituting Annex No. 2 To The Swz.3. The Subject Of The Order Was Not Divided Into Parts. Justification For Not Dividing The Order Into Lots: The Scope And Nature Of The Order Exclude Its Division Into Lots For Technical, Organizational, Economic And Expediency Reasons. The Procedure Constituting The Subject Of This Order Is Usually Of Interest And Is Possible To Be Implemented By Entrepreneurs Constituting Small Or Medium-Sized Enterprises. It Is Not Technically Possible To Divide The Order Into Parts Because All Stages Of The Order Are Closely Related. Entrusting The Execution Of Individual Stages To Different Contractors Would Jeopardize The Proper Execution Of The Order. Not Dividing The Task Will Contribute To Better Organization Of Work And More Efficient Coordination Of The Entire Project. It Should Also Be Noted That The Lack Of Division Of The Contract Into Parts Does Not Restrict Competition And Ensures Equal Access For Entities.4. The Minimum Quality Warranty Period Required By The Ordering Party For Construction Works And Installed Devices Is 60 Months. Regardless Of The Quality Guarantee Granted For Construction Works, The Contractor Is Liable To The Ordering Party Under The Warranty For Defects, On The Terms Specified In The Civil Code, I.E. The Contractor Is Liable Under The Warranty If A Physical Defect Is Detected Within Two Years, And In The Case Of Real Estate Defects - Within Five Years From The Date Of Final Acceptance.5. The Contractor Must Provide Security For The Site/Work Site And Its Surroundings, Perform The Work In Accordance With The Pr
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114306598
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.