The Subject Of The Order Is: Reconstruction Of Municipal Roads In Łambinowice, Ul. Leśna And Piątkowice-Drogoszów. I. Subject Of The Order. The Subject Of The Order Is The Reconstruction Of The Municipal Road Ul. Leśna In Łambinowice With A Total Length Of 456 Meters And Reconstruction Of The Municipal Road Between Piątkowice And Drogoszów (Stage 1) On A Section Of 613 Meters In Length, Located Within Piątkowice, Together With The Reconstruction Of The Adjacent Internal Road, Plot No. 457, Divided Into 2 Parts. 1. Scope Of The Order: A) Part I Titled: Reconstruction Of The Municipal Road Along Leśna Street In Łambinowice Includes: The Task Planned For Implementation Includes, Among Others: Preparatory, Measurement And Demolition Works, Temporary Traffic Organization, Construction Of A New Road Structure, Construction Of Roadsides And Sidewalks, Adjustment Of Technical Infrastructure Devices, Replacement Of A Culvert, Construction Of Vertical Markings And Tidying Up The Area After The Works Are Completed. A Road With A Width Of 3.5-5.0 M Was Designed Within The Existing Road And Traffic Category Kr1. The Scope Of The Investment Includes Road Works Aimed At Improving The Technical And Operational Parameters Of The Road, Improving Traffic Safety And Ensuring Proper Drainage. The Works Should Be Performed In Accordance With: - Design Documentation, - Detailed Technical Specifications For The Execution And Acceptance Of Construction Works, - Agreement With Polska Spółka Gazownictwa, - Agreement With The District Office In Nysa, - Applicable Standards And Legal Regulations, - Principles Of Technical Knowledge And Construction Art. Ii. Description Of The Existing Condition. The Above Road Provides Access To Agricultural Land And Property In Łambinowice. The Beginning And End Of The Development Are Connected To The Existing Asphalt Concrete Roadway. In Its Existing Condition, The Road Has A Dirt And Gravel Surface Paved In An Uncontrolled Manner With Gravel, Stone, Stone And Crumbs. The Road Does Not Have The Required Load-Bearing Capacity And Evenness Parameters, Therefore Ponding Water Occurs During Rainfall. The Road Is Drained On The Surface Into The Road Area. Iii. Scope Of Works.The Scope Of The Order Includes In Particular:1. Preparatory Works• Development, Agreement And Introduction Of Temporary Traffic Organization,• Marking And Securing The Work Area,• Measurement And Surveying Works,• Preparation Of An As-Built Surveying Inventory. 2. Demolition Works• Cutting Of Existing Bituminous Surfaces,• Demolition Of Existing Surfaces,• Demolition Of Culvert Elements,• Demolition Of Existing Signage,• Loading, Removal And Management Of Demolition Materials In Accordance With Applicable Regulations. 3. Earthworks And Construction • Execution Of Earthworks And Trenching, • Profiling And Compaction Of The Subsoil, • Construction Of An Improved Subgrade Layer, • Construction Of Crushed Aggregate Base, • Construction Of A Bituminous Surface: O Ac16w Binding
|