3.2. The Subject Of The Construction Project Is The Reconstruction Of The Existing Multi-Functional Sports Field At The Sports And Recreation Center In Tuchola. The Task Is Co-Financed From The Budget Of The Kujawsko-Pomorskie Voivodeship, Under The Kujawsko-Pomorska Small Sports Infrastructure - 2026 Edition Program.3.3. The Reconstruction Of The Multi-Functional Sports Field At Osir In Tuchola Includes: 1. Replacement Of The Existing Surface, Including: - Scraping And Removal Of The Existing Surface, - Leveling The Stone Base, - Laying A Flexible Et 35 Mm Base, - Laying The Surface Using Epdm 13 Mm Technology,2. Equipment, Including: - Installation Of Volleyball Sleeves And Posts, - Installation Of Basketball Sleeves And Posts, - Installation Of Basketball Structures, 3. Works Presented In The Drawings: - Development Of The Plot - Playing Fields Covered By Renovation, - Drainage In The Area Covered By The Study, - Geodetic Map. The Contractor Will Be Obliged To Carry Out Construction Works With Particular Attention And Caution, Due To The Nature Of The Facility. If The Facility Is Open During Construction Works, The Contractor Will Have To Secure The Construction Site In Such A Way That It Does Not Interfere With The Function Of The Facility. A Detailed Description Of The Order Is Included In The Documents Listed Below: - Technical Documentation - Renovation Of The Existing Sports Field At Osir In Tuchola; - Contract Template. 3.7. As An Alternative, The Ordering Party Provides The Bills Of Quantities: - Bill Of Quantities - Reconstruction Of A Multifunctional Pitch With Replacement Of Surface And Drainage Although The Settlement Of The Task Is A Lump Sum, The Ordering Party Requires The Contractor Selected In This Procedure To Provide A Bid And As-Built Cost Estimate - For The Purposes Of Settling The Investment By The Ordering Party Along With The Material Scope Of The Works Performed. The Ordering Party Additionally Provides The Bill Of Quantities Used To Prepare The Offer, Which The Contractor Will Submit No Later Than On The Day Of Signing The Contract. Any Changes That Will Occur In The As-Built Cost Estimate In Relation To The Offer Cost Estimate Should Be Described In Detail In Terms Of Content, Dimensions And Costs.3.3. Before Commencing The Work, The Contractor Will: - No Later Than On The Day Of Handing Over The Construction Site, Submit A List Of Persons Delegated To Carry Out The Order, Together With A Declaration That They Are Employed Under An Employment Contract; - Indicate The Construction Officials, Along With Their Construction Licenses And Certificates Of Membership In The Relevant Chamber Of Civil Engineers - Works Manager - Construction Industry; - Provide The Ordering Party With A Detailed Material Specification Along With Information About The Products (Declarations Of Conformity), For Approval By The Supervision Inspector.3.4. The Contractor Undertakes To Carry Out All Works In Accordance With The Design Documentation,
Contact Information
Address
Gmina Tuchola,Tuchola,89-500,Kujawsko-Pomorskie,Pl618 - Świecki
Email
przetargi212@tuchola.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114306507
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.