1.2. Part I - Modernization Of A Full-Size Football Pitch On Plots No. 461/4 And 475/5A) Replacement Of The Sports Pitch With An Artificial Grass Surface With A Fiber Height Of 60 Mm With Epdm Filling - Gray Color - 7037 According To The Ral Pattern On A Permeable Base; B) Construction Of A New 50 Cm Wide Landscape Grass Surface Around The Pitch; Please Note: The Existing Pitch Has An Underground Irrigation System With Pipelines At A Depth Of 0.5 M, Which Should Be Left. The Ordering Party Will Dismantle 2 Sprinklers Within The Pitch At Its Own Expense. The Remaining Parts Should Be Left.C) Disposal Of The Natural Surface;D) Construction Of A Drainage System To Discharge Groundwater From Atmospheric Precipitation Into The Existing Drainage Pipeline In Accordance With The Design;E) Installation Of Small Architectural Elements, Including: • Panel Fencing On A Foundation With A Height Of At Least 1.3 M, With 2 Sets Of System Gates, 2 Sets Of System Gates, 1 Set Of Technical System Gates, Made Of Closed Panels 382Mb (In The Case Of Panels Made Of Wire - Ø Min. 6Mm), • Construction Of 2 Ball Catchers With A Total Length Of 148.6Mb And H = 6M • Pitch Lighting With 6 Poles With Led Lamps, Controlled By The Dali System. Note: Lighting Intensity Level Above The Pitch – Min. 300Lx; The Power Connection Is Located In The Existing Storage Room; • Pedestrian Hardening Made Of 6 Cm Thick Paving Stones, 988 M². Note: The Area For The Pedestrian Path Is Prepared • Delivery And Assembly Of 1 Set Of Aluminum Goals With Nets, Certified And Approved For League Games; • Delivery And Assembly Of 2 Boxes For Reserve Players On Transport Wheels With 13 Seats For Reserve Players For Each Box; • Delivery Of 1 Medical Point On Wheels As In The Project; F) Note: This Task Does Not Include The Delivery And Installation Of A Roofed Stand; This Point Of The Bill Of Quantities Should Not Be Included In The Offer;G) Lighting Installation Includes:• Laying Of Cables Taking Into Account Dali System Control• Foundation Of Lighting Poles With H=16M• Installation Of A Control Board• Installation Of Lighting Fixtures Resulting In A Light Intensity Of 1M Above The Pitch Of At Least 300Lx• Installation Of A Dali Control System, Ensuring Switching On A Total Of 3 Sections And Each Separately) Demolition Works Include:• Existing Gates - 2 Sets• Existing Fences – 435 M• Existing Sidewalk – 55 M²• Existing Barrier Fences Should Be Dismantled In A Way That Does Not Destroy Them
Contact Information
Address
Gmina Pniewy,Pniewy,62-045,Wielkopolskie,Pl418 - Poznański
Email
przetargi@pniewy.wlkp.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114306462
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.