Construction Of Green Public Transport Stops In Końskowola. The Subject Of The Order Is A Construction Work Entitled: Construction Of Green Public Transport Stops In The Town Of Końskowola. The Investment Includes The Dismantling Of The Existing 2 Bus Shelters And Then Replacing Them With 2 Green Public Transport Stops In The Town Of Końskowola At Ul. Lubelska, On Plots With Geod. No. 458/5 And 236/2 And A Fragment Of Plot 237/2. Each Stop Will Have The Form Of A Green Shelter Covered With Grass And Other Plants, With A Steel Structure And Wooden Roofing, With Wooden Benches, An Illuminated Information Display, Two Advertising Screens And A Waste Bin. A Conservation Permit And Technical Conditions Were Obtained For The Investment In Question From The Provincial Roads Authority In Lublin; The Investment Will Be Carried Out On The Basis Of The Application. Technical Parameters Of Each Shelter: 1) Single-Story Buildings, With A Supporting Roof Structure Made Of Steel Elements, 2) Facade Cladding Made Of Wooden Boards, 3) Green Roofs With An Area Of 10.00 M2, Covered With Grass And Other Plants, 4) Foundation Depth - 1.00 M, 5) Width Of The Front Facade - 6.72 M, 6) Height - 2.99 M, The Scope Of Work And The Contractors Responsibility Within The Scope Of The Proposed Offer Price Also Includes: 1) Organization And Development Of The Construction Site, 2) Organizing The Construction Facilities And The Supply Of Utilities (Electricity, Water, Etc.) On Its Own And At Its Own Expense (Electricity, Water, Etc.) Or Paying Fees For Electricity Consumption And Water Consumption For The Purposes Of The Construction And Facilities, According To Meter Readings Or Arrangements - In The Case Of Using The Ordering Partys Installation, 3) Marking And Securing The Works Performed Works And Ensuring Safety At The Construction Site, 4) Developing And Obtaining Approval From The Relevant Authorities Of A Traffic Organization Plan For The Duration Of Construction Works - If Necessary, 5) Obtaining Permission To Occupy The Road And Paying A Fee For This - If Necessary, 6) Conducting All Arrangements With The Relevant Administrative Authorities - For This Purpose, The Ordering Party Will Issue The Appropriate Authorization To Act On Behalf Of The Ordering Party, 7) Organizing And Carrying Out The Necessary Tests, Examinations And Acceptances And Possibly Supplementing The Acceptance Documentation For The Scope Of Works Covered By The Subject Matter Order,8) Obtaining On Behalf Of The Ordering Party: A) Arrangements Resulting From Decisions And Permits - To The Extent Required, B) All Documents Necessary For The Formal Completion Of The Construction Work,9) Waste Management - The Contractor Is Obliged To Transport Garbage And Material Waste To The Landfill On His Own. The Costs Related To Landfill Fees Are Borne By The Contractor. The Contractor Undertakes To Perform All The Obligations Of The Producer And Holder Of Waste Within The Meaning Of The Act Of December 14, 2012 O
Contact Information
Address
Gmina Końskowola,Końskowola,24-130,Lubelskie,Pl815 - Puławski
Contact No.
+48818816201128
Email
akasprzak@konskowola.info.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114306404
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.