1. The Subject Of This Order Are Construction Works Consisting In Replacing The Electrical Installation At The 1St Secondary School. Kazimierza Wielki In Łęczyca - Stage I. Important: As Part Of The Subject Of The Order, The Contractor Will Only Perform Stage I From The Attached Design Documentation: - Installation Of The Zk-Pwp Connector With Fire Protection Switch Installations; - Installation Of Wlz Power Lines For Newly Designed Peripheral Switchgears; - Installation Of Newly Designed Peripheral Switchgears; - Installation Of Fiber Optic Installations For Rack/Lan-2 And Rack/Lan-3 Cabinets; - Installation Of A Bell Installation School; - Dismantling Of Existing Circuit Switchboards; - Temporary Connection Of Existing Circuits To Overcurrent Protection In New Switchboards. The Contractor Will Commission The Above-Mentioned Installation Along With The Necessary Measurements. The Ordering Party Requires That The Places Adjacent To The Works Area Be Tidied Up Every Day, And The Works Area Be Secured Against Access By Unauthorized Persons And Fenced Off In A Way That Allows Normal Use Of The Areas Adjacent To It By Students (Matriculation Examination, Enrollment In Schools). Secondary Schools) And School Employees. If It Is Necessary To Carry Out Renovation, Repair Or Installation Work During The Operation Of The School Or Facility, These Works Are Organized In A Way That Does Not Expose People Staying At The School To Danger Or Nuisance Resulting From The Work Carried Out And With The Use Of Special Precautions. Workplaces And Rooms To Which Access By Unauthorized Persons Is Prohibited Are Appropriately Marked And Secured Against Free Access.2. Construction Works Will Be Carried Out On The Employers Premises And Facility Where Statutory Educational Activities Are Conducted. The Contractor Undertakes To Take Into Account All Comments And Limitations Of The Ordering Party And The User In This Respect. Organization Of Implementation Works: The Contractor Is Obliged To Agree On The Organizational Details Related To The Implementation Of The Works With The School Principal. The Works Should Be Organized In Such A Way As To Ensure The Continuity Of The Schools Operation And Management And To Minimize Any Disruptions In The Operation Of The School, Including Ensuring Uninterrupted Supply Of Electricity. All Works Will Be Carried Out On An Active School Facility, Therefore The Contractor Is Obliged To Plan And Carry Out The Works In A Way That Is As Least Disruptive To The Proper Functioning Of The School As Possible, While Ensuring The Safety Of Students, School Employees And Other People Staying On The Premises. The Contractor Should Make Every Effort To Limit Any Inconvenience Related To The Work Being Carried Out, Including Compliance With The Regulations Regarding The Permissible Noise Level At Specific Hours Of The Day. The Contractor Is Obliged To Agree Working Hours With The School Principal. The Contractor Is Obliged To Agree With The School Pri
Contact Information
Address
Powiat Łęczycki,Łęczyca,99-100,Łódzkie,Pl715 - Skierniewicki
Contact No.
243887200
Email
sekretariat@leczyca.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114306196
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.