Prior Information Notice For Architectural, Construction, Engineering And Inspection Services – Ve018 Fachplanung Pts. Fraport Ag Intends To Fundamentally Technically Renovate Terminal 2 (T2) In The Coming Years. The Terminal Is Intended To Be Part Of The Technical Renovation Can Be Brought Into A New Life Cycle. The Aim Of The Renovation Is To Eliminate All Technical Risks. Operational And Complete Compliance With Building Regulations And Fire Protection Regulations. As Well As Occupational Safety Law. Requirements Including An Energy Optimization Also In The Following Years After The Renewed Use. The Renovation Of T2 Is Also Intended To Functionally Optimize The Terminal Facility In Order To Be Able To Integrate The Facility Into The Hub System Of The Lufthansa Group And The Star Alliance. As Part Of A Preliminary Investigation By Ifm/Zim, Various Measures Were Identified With A Focus On The Renovation Of The T2 In Order To Ensure Operational Safety And Building Permit Requirements. Operation Including To Ensure Fire Protection. The Focus Of The Construction Work Is On The Technical. Building Equipment. The Renovation Included, Among Other Things: The Following Trades Have Been Identified: Water, Waste Water, Heat/Cold, Air Conditioning/Smoke Extraction, General And Safety Power Supply, Bma And Ela, Driving Systems, Sprinklers And Other Fire Extinguishing Systems, Ga, Other Trades. It Is Planned To Begin Carrying Out Individual Preliminary Measures From 2027. The Main Renovation And Conversion Work Is Expected To Be Carried Out Between The Beginning Of 2030 And The End Of 2033. During This Period, The T2 Will Be Temporarily Taken Out Of Operational Use For Passenger Operations. Individual Partial Services Are To Be Provided Subsequently Until 2034. In Accordance With Building Regulations, The T2 Remains In Operation. Other Functions Will Remain In Use During The Construction Work (E.G. The Station Of The Passenger Transport System (Pts) T2 As A Transfer Station, Baggage Handling Areas And Baggage Conveyor Systems, Areas For Aircraft Handling With Operations Management, Parking Facilities T2). The Subject Of This Tender Is System And Integration Planning And Coordination Services In Connection With The Effects Of Converting An Existing Pts Station To Two Existing Independent, Driverless Cbtc-Guided Transport Systems While Maintaining Operations. The Services Include In Particular The Investigation And Evaluation Of The Technical, Functional And Operational Aspects Resulting From The Station Conversion. And Safety-Related Impacts. The Station To Be Converted Has A Total Of 4 Lanes And 5 Platforms. The Platforms Are Assigned Different Passenger Statuses (Domestic / International). As Part Of The Planned Measures, A New Allocation Of Platforms Is Planned, Which Will Have Corresponding Effects On The Pts Systems (Including Stopping Positions; Vehicle Door Openings; Display And Information Systems, Call Systems, Etc.). The Services Include The Necessary Technical Additional Work, The System-Specific. Impact Assessment
Contact Information
Contact No.
069 690-22071
Email
ausschreibung@fraport-ausbau-sued.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 114300649
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.