The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Project Titled: Modernization Of The Village Cultural Center In Płocicz With Improvement Of Energy Efficiency And Accessibility For Residents. The Area Covered By The Study Is Located In The Town Of Płocicz, Within The Kamień Krajeński Registration Area, On Plot No. Possibly 160/1. The Scope Of Construction Works Covered By The Subject Order Includes General Renovation Of The Building: 1) Demolition Works (Excluding The Boiler Room - The Existing Boiler Should Be Adapted To The Designed Underfloor Heating In Rooms 1, 2, 3, 4, 5, 6, 14 By Using A Mixing Set); 2) Roof For The Entire Building - Styrofoam Thick. 15 Cm + Sheet Metal Flashings (+ Roof Over The Boiler Room); 3) Above-Ground Elevation For The Entire Building - In Accordance With The Technology Drawing And The Finishing Materials Used (+ Boiler Room Elevation); 4) Replacement Of External Windows And Doors For The Entire Building (+ Internal And External Window Sills); 5) Sidewalks And Strips Around The Area;6) Interior Finishing Works (Replacing Plasters, Reptiles, Painting Walls, Tiling Works, Leveling The Floor With Finishing Layers, Replacing Internal Doors, Etc.) - Along With Additional Works Resulting From The Scope Of Works For The Following Rooms: • Room. No. 1. Common Room, • Room No. 2. Stage, • Room. No. 3. Room Storage, • Room No. 4. Vestibule, • Room. No. 5. Disabled And Womens Toilet, • Room No. 6. Mens Toilet, • Room No. 14, Food Reheating Room;7) System Suspended Ceilings For The Rooms. 2, 3, 4, 5, 6, 14; 8) Execution Of Sanitary Installations (Heating Installation, Water And Sewage Installation, Sanitary And Technological Sewage Installation, Cold And Hot Water Installation, White Installation), Electrical Installation (Including Main Power Switch, Basic And Emergency Lighting, Plug-In Sockets, Lightning Protection System, Call System For The Disabled) For The Following Rooms: • Room. No. 1. Common Room, • Room No. 2. Stage, • Room. No. 3. Room Storage, • Room No. 4. Vestibule, • Room. No. 5. Disabled And Womens Toilet, • Room No. 6. Mens Toilet, • Room No. 14, Food Reheating Room; 9) Carrying Out All Necessary Works For The Proper Execution Of The Order. A Detailed Description Is Included In The Construction Design, Stwiorb.
|