|
Supply And Placement Of Work Sign In Galvanized Sheet #26 1.1, Night Watchman With Additional Charges 1.2, Rental Of Chemical Toilet 1.3, Rental Of Container With Thermal Insulation, Type 1 1.4, Mobilization And Demobilization Of Container 1.5, Assembly And Disassembly Of Tower Type Tubular Metal Scaffolding, 3.2, Solvent-Based Enamel Painting On Metallic Structures 3.3, Epoxy Painting On Floors, Two 2 Coats, With Manual Application 3.4, Epoxy Painting On Floor Demarcation Strips 3.5, Acrylic Painting For Floors On Pavements, Cemented Surfaces 3.6, Pva Latex Painting On Walls, Two 2 Coats 3.7, Painting Acrylic On Wall, Two 2 Coats 3.8, Preparation For Plastering Or Latex Acrylic Paint On Wall 3.9, Solvent Based Enamel Paint On Galvanized Tube, 3.10, Solvent Based Enamel Paint On Iron Frames 3.11, Solvent Based Enamel Paint On Metallic Surfaces 3.12, Fencing For Court Sports, Made Of Galvanized Wire Mesh With A 2 4.1 Diamond-Shaped Mesh, Manual Demolition Of Concrete, Without Frame 5.1, Manual Excavation Of Earth, Manual Excavation 5.2, Manual Drilling Of Auger Type Piles 5.3, Manual Excavation Of A Trench With A Depth Of Less Than Or Equal To 1.5M 5.4, Manual Piling At The Bottom Of A Trench With Socket 5.5, Transition Slab In Concrete Prepared On Site With Concrete Mixer With Fck Of 10Mpa 5.6, Masonry Of Full Concrete Block Without Frame 5.7, Pillar In Exposed Concrete 20 Mpa 5.8, Slab With Mortar, Mix 1:3 Cement And Sand 5.9, Coating With Mortar In A Single Layer, Applied To Wall 5.10, Painting Of Symbols And Texts With Acrylic Paint 5.11, External Railing, Height 130Cm, In Galvanized Tube 5.12, Solvent Based Enamel Painting On Guardrail, With Or Without Handrail 5.13, Trapezoidal Galvanized Ridge, Simple Type 6.1, Circular Rainwater Conduit For Roof In 6.2 Pvc Tube, Volleyball Post Or Official Shuttlecock Paired With Net, In 7.1 Steel Tube, Official Basketball Backboard With Fixed Rim, Net And 7.2 Metal Post, Futsal Goal Pair With Net, In Steel Tube, 3 7.3 Diameter, Ramp For Disabled Access, In Simple Concrete Fck = 25 Mpa 8.1, Mechanized Demolition Of Concrete, Without Frame, With Electrical Equipment 9.1.1, 5M 9.1.2, Manual Drilling Of Auger Type Pile, Including Spacing 9.1.3, Manual Piping In Trench Bottom With Socket 9.1.4, Masonry Of Full Concrete Block Without Frame, In Concrete With Fck Of 20Mpa 9.2.1, Cutting, Bending And Assembling Ca50 Steel, Diameter 10Mm, Including Spacer 9.2.2, Bending And Assembling Ca60 Steel, Diameter 5Mm, Including Spacer 9.2.3, Slab 10 Cm Solid Concrete 20 Mpa, With Frame, Resin Formwork, Propping And Shaping 9.2.4, Formwork And Shaping Of Board And Batten, 3X Reuse, Exclusive Shoring 9.2.5, Manual Excavation For Crowning Block Or Footing 9.2.6, Block Frame Using 10 Mm Ca50 Steel Assembly. 9.2.7, Fence Masonry With Perforated Ceramic Brick 9.3.1, Supply Of Structural Concrete, Prepared On Site 9.4.1, Masonry Tie Belt With Structural Concrete Block, Type U Channel 9.4.2, Diameter 6, 3Mm, Including Spacer 9.4.3, Trace 1:3 Cement E Sand, 9.5.1, Plastering With Mortar, Mixture 1:7 Cement And Sand 9.5.2, Subfloor Straightened With Mortar, Mixture 1:3 Cement And Sand 9.5.3, Transition Slab In Concrete Prepared On Site With Concrete Mixer With 10Mpa Fck 9.5.4, Ceramic Coating Applied On Floor, Finish Enamelled 9.5.5, Ceramic Coating
|