|
Full Site Civil Engineer With Additional Charges, Siding With Metallic Tile. Af_03/2024, Temporary Installations Of Light, Power, Telephone And Logic, Easel Kit For Water Measurement - Main Entrance, In Pvc 25 Mm (3/4) - Supply And Installation (Exclusive Hydrometer). Af_03/2024, Rental Of Container 2, 30 (Does Not Include Mobilization/Demobilization), Mobilization And Demobilization Of Container, Including Loading, Unloading And Transport In Truck Body With Crane (Munck), Exclusive Container Rental, Supply And Installation Of Work Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), With Tracked Tractor., Clay Or Clay For Embankment/Backfill (With Transport Up To 10 Km), Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit M3xkm). Af_07/2020, Execution And Compaction Of Landfill Body (95% Of Normal Proctor Energy) With Predominantly Clay Soil Thickness 15 Cm - Exclusive Material, Excavation, Loading And Transport. Af_09/2024, Ballast With Granular Material (Medium Sand), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_01/2024, On Via Urbanapavimenteda, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Separator Layer For Execution Of Radier, Concrete Floor Or Slab On Ground, In Plastic Tarpaulin. Af_09/2021, Manufacture, Assembly And Disassembly Of Formwork For Radier, In Lumber, 4 Uses. Af_09/2021, Frame For Radier Execution, Using Q-92 Screen. Af_09/2021, Radier Concreting, Fck 30 Mpa - Laying, Densification And Finishing. Af_09/2021, Expansion Joint Treatment, With Polyethylene Billet And Pu Sealant, Including Filling With Pu Expansive Foam. Af_09/2023, Execution Of Contraction Joints For Concrete Floors. Af_04/2022, Floor Painting With Epoxy Paint, Manual Application, 2 Coats, Including Epoxy Primer. Af_05/2021 (Green), Including Epoxy Primer. Af_05/2021 (Blue), Including Epoxy Primer. Af_05/2021 (Orange), Including Epoxy Primer. Af_05/2021 (Light Grey), Multi-Sports Court Demarcation Painting With Epoxy Paint, E = 5 Cm, Manual Application. Af_05/2021, Polished Concrete Bench Base In Painted Exposed Brick Masonry - Goinfra Pattern, Fencing For Multi-Sports Court, Structured By Galvanized Steel Tubes, (Stands With Diameter 2, Crossbeams And Struts With Diameter 1 ¼), With Galvanized Wire Mesh, 14 Bwg Wire And Square Mesh 5X5cm (Except Mureta). Af_12/2025, Gate With 1 Sheet Of (1, 00X2, 00) M, In Galvanized Wire Mesh No. 2, Sintered In Concrete Blocks, Including Excavation, Backfilling, Loading, Unloading, Transport And Painting Of The Tubes With 2 Finishing Coats.
|