|
Bids Are invited for Operation And Maintenance Of Electrical Systems/Electrical Installations - Complete System - Engaging Of Skilled Labour For Carrying Out Electrical Works Like Wiring, Conduiting, Electrification And Other Miscellaneous Electrical Works As Per Instructions From Engineering In Charge ( 1 Man /Day = 8 Hours Of Work). , Engaging Of Unskilled Labour For Carrying Out Casual/Unspecified Works Like Clearing Of Site, Shifting Of Inventory, And Other Miscellaneous Works As Per Instructions From Engineering In Charge ( 1 Man/ Day = 8 Hours Of Work). , Wiring For Light Point/ Fan Point/ Exhaust Fan Point/ Call Bell Point With 1.5 Sq.Mm Frls Pvc Insulated Copper Conductor Single Core Cable In Surface / Recessed Medium Class Pvc Conduit, With Modular Switch, Modular Plate, Suitable Gi Box And Earthing The Point With 1.5 Sq.Mm. Frls Pvc Insulated Copper Conductor Single Core Cable Etc. As Required. ( Group C) , Wiring For Circuit/ Submain Wiring Along With Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface/ Recessed Medium Class Pvc Conduit As Required.2 X 1.5 Sq. Mm + 1 X 1.5 Sq. Mm Earth Wire , Wiring For Circuit/ Submain Wiring Along With Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface/ Recessed Medium Class Pvc Conduit As Required.2 X 2.5 Sq. Mm + 1 X 2.5 Sq. Mm Earth Wire , Wiring For Circuit/Submain Wiring Along With Earth Wire With The Following Sizes Of Fr Pvc Insulated Copper Conductor, Single Core Cable In Surface/ Recessed Medium Class Pvc Conduit As Required.2 X 4 Sq. Mm + 1 X 4 Sq. Mm Earth Wire. , Wiring For Circuit/ Submain Wiring Along With Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface/ Recessed Medium Class Pvc Conduit As Required.2 X 6 Sq. Mm + 1 X 6 Sq. Mm Earth Wire , Wiring For Circuit/ Submain Wiring Along With Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface/ Recessed Medium Class Pvc Conduit As Required.4 X 4 Sq. Mm + 2 X 4 Sq. Mm Earth Wire , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.3 X 1.5 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.4 X 1.5 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.3 X 2.5 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.3 X 4 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.4 X 4 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.5 X 4 \Sq.Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.3 X 6 Sq. Mm , Supplying And Drawing Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In The Existing Surface/ Recessed Steel/ Pvc Conduit As Required.4 X 6 Sq. Mm , Supplying And Fixing Of Following Sizes Of Pvc Conduit Along With Accessories In Surface/Recess Including Painting In Case Of Surface Conduit, Or Cutting The Wall And Making Good The Same In Case Of Recessed Conduit As Required. - 20 Mm , Supplying And Fixing Of Following Sizes Of Pvc Conduit Along With Accessories In Surface/Recess Including Painting In Case Of Surface Conduit, Or Cutting The Wall And Making Good The Same In Case Of Recessed Conduit As Required. - 25 Mm , Supplying And Fixing Of Following Sizes Of Casing Caping Along With Accessories In Surface/Recess Including Painting In Case Of Surface Conduit, Or Cutting The Wall And Making Good The Same In Case Of Recessed Conduit As Required. - 20 Mm , Supplying And Fixing Following Size/ Modules, Gi Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.1 Or 2 Module (75Mmx75mm) , Supplying And Fixing Following Size/ Modules, Gi Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.3Module (100Mmx75mm) , Supplying And Fixing Following Size/ Modules, Gi Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.4 Module (125Mmx75mm) , Supplying And Fixing Following Size/ Modules, Gi Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.6 Module (200Mmx75mm) , Supplying And Fixing Following Size/ Modules, Gi Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.8 Module (125Mmx125mm) , Supplying And Fixing Following Size/ Modules, Plastic Surface Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.1 Or 2 Module (75Mmx75mm) , Supplying And Fixing Following Size/ Modules, Plastic Surface Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.3 Module (100Mmx75mm) , Supplying And Fixing Following Size/ Modules, Plastic Surface Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.4 Module (125Mmx75mm) , Supplying And Fixing Following Size/ Modules, Plastic Surface Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.6 Module (200Mmx75mm) , Supplying And Fixing Following Size/ Modules, Plastic Surface Box Along With Modular Base & Cover Plate For Modular Switches In Recess Etc. As Required.8 Module (125Mmx125mm) , Supplying And Fixing Following Modular Switch/ Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.5/6 S Switch , Supplying And Fixing Following Modular Switch/ Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.3 Pin 5/6 Socket Outlet , Supplying And Fixing Following Modular Switch/ Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.15/16 S Switch , Supplying And Fixing Following Modular Switch/ Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.6 Pin 15/16 A Socket , Supplying And Fixing 32 S, 415 Volts, Tpn Industrial Type, Socket Outlet, With 4 Pole And Earth, Metal Enclosed Plug Top Along With 32 S C Curve, Tp Mcb, In Sheet Steel Enclosure, On Surface Or In Recess, With Chained Metal Cover For The Socket Outlet , Supplying And Fixing 20 S, 240 Volts, Spn Industrial Type, Socket Outlet, With 2 Pole And Earth, Metal Enclosed Plug Top Along With 20 S C Curve, Sp, Mcb, In Sheet Steel Enclosure, On Surface Or In Recess, With Chained Metal Cover For The Socket Out Let And Complete With Connections, Testing And Commissioning Etc. As Required. , Supplying And Fixing Following Rating, Four Pole, (Three Phase And Neutral), 415 Volts, Residual Current Circuit Breaker (Rccb), Having Following Sensitivity Current In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required63a, 100Ma , Supplying And Fixing Following Rating, Four Pole, (Three Phase And Neutral), 415 Volts, Residual Current Circuit Breaker (Rccb), Having Following Sensitivity Current In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required63a, 300Ma , Supplying And Fixing Following Rating, Double Pole, (Single Phase And Neutral), 240 Volts, Residual Current Circuit Breaker (Rccb), Having A Sensitivity Current 30 Ma In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required40a, 30Ma , Supplying And Fixing 6 A To 32 A Rating, 240/415 V, 10 Ka, C Curve, Miniature Circuit Breaker Suitable For Inductive Load Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required. Single Pole , Supplying And Fixing 6 A To 32 A Rating, 240/415 V, 10 Ka, C Curve, Miniature Circuit Breaker Suitable For Inductive Load Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required.Double Pole , Supplying And Fixing 40 A Rating, 415 V, 10 Ka, C Curve, Miniature Circuit Breaker Suitable For Inductive Load Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required.Four Pole , Supply And Fixing Of Following Rating, 4 Pole, 415 Volt Isolator In The Exisitng Mcb Db Complete With Connections, Testing And Commissioning Etc As Required.63 A , Providing And Fixing M.V. Danger Notice Plate Of 200 Mm X 150 Mm, Made Of Mild Steel, At Least 2 Mm Thick, And Vitreous Enamelled White On Both Sides, And With Inscription In Single Red Colour On Front Side As Required. , Earthing With G.I. Earth Pipe 4.5 Metre Long, 40 Mm Dia Including Accessories, And Providing Masonry Enclosure With Cover Plate Having Locking Arrangement And Watering Pipe Etc. .With Charcoal/ Coke And Salt As Required. , Earthing With G.I. Earth Plate 600 Mm X 600 Mm X 6 Mm Thick Including Accessories, And Providing Masonry Enclosure With Cover Plate Having Locking Arrangement And Watering Pipe Of 2.7 Metre Long Etc. With Charcoal/ Coke And Salt As Required. , Repairing Of Earth Pits By Dismantling The Existing Masonry Enclosure And Providing Rcc Enclosure Of 1:2:4 Grade (1 Cement : 2 Coarse Sand : 4 Graded Stone) And Reinforced With Steel Rods 8Mm Dia In A Pattern Approved By Aai, Providing Hinged Ms Cover Of Minimum 8 Mm Thickness With Suitable Locking System As Per Specifications Including, Painting The Earth Pit Portion Above Ground And Cover Plate, Numbering The Same, Providing And Fixing Suitable Funnel, Removing Of Debris Etc. As Per The Direction Of Eic. , Providing And Fixing 6 Swg Dia G.I. Wire On Surface Or In Recess For Loop Earthing Along With Existing Surface/ Recessed Conduit/ Submain Wiring/ Cable As Required. , Providing And Fixing 25 Mm X 5 Mm G.I. Strip On Surface Or In Recess For Connections Etc. As Required. , Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Wall Surface As Required.Up To 35 Sq. Mm (Cl Ed With 1Mm Thick Saddle) , Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Wall Surface As Required.Above 35 Sq. Mm And Up To 95 Sq. Mm (Cl Ed With 25X3mm Ms Flat Cl ) , Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Cable Tray As Required.Up To 35 Sq.Mm (Cl Ed With 1Mm Thick Saddle) , Laying And Fixing Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size On Cable Tray As Required.Above 35 Sq. Mm And Up To 95 Sq. Mm (Cl Ed With 25X3mm Ms Flat Cl ) , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size Direct In Ground Including Excavation And Refilling The Trench Etc. As Required, But Excluding Sand Cushioning And Protective Covering.Up To 35 Sq. Mm , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size Direct In Ground Including Excavation And Refilling The Trench Etc. As Required, But Excluding Sand Cushioning And Protective Covering.Above 35 Sq. Mm And Up To 95 Sq. Mm , Laying Of One Number Pvc Insulated And Pvc Sheathedd /Xlpe Power Cable Of 1.1 Kv Grade Of Following Size Ith Existing Masonry Open Duct As Required.Upto 35 Sq. Mm , Laying Of One Number Pvc Insulated And Pvc Sheathedd /Xlpe Power Cable Of 1.1 Kv Grade Of Following Size Ith Existing Masonry Open Duct As Required.Above 35 Sq. Mm And Upto 95 Sq. Mm , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size In The Existing Rcc/ Hume/ Metal Pipe As Required.Up To 35 Sq. Mm , Laying Of One Number Pvc Insulated And Pvc Sheathed / Xlpe Power Cable Of 1.1 Kv Grade Of Following Size In The Existing Rcc/ Hume/ Metal Pipe As Required.Above 35 Sq. Mm And Up To 95 Sq. Mm , Supplying And Making Straight Through Joint With Heat Shrinkable Kit Including Ferrules And Other Jointing Materials For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.4 X 16 Sq. Mm , Supplying And Making Straight Through Joint With Heat Shrinkable Kit Including Ferrules And Other Jointing Materials For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.4 X 25 Sq. Mm , Supplying And Making Straight Through Joint With Heat Shrinkable Kit Including Ferrules And Other Jointing Materials For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.3½ X 35 Sq. Mm , Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.4 X 25 Sq. Mm (28Mm) , Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.3.5X 35 Sq. Mm (32Mm) , Supplying And Making End Termination With Brass Compression Gland And Aluminium Lugs For Following Size Of Pvc Insulated And Pvc Sheathed / Xlpe Aluminium Conductor Cable Of 1.1 Kv Grade As Required.3.5X 50 Sq. Mm (35Mm) , Excavation Of The Cable Trenches In Hard Rock Not Exceeding 1.5 Metres In Width And Lift Up To 1.5 Metres, Including Getting Out The Excavated Soil And Disposal Of Excavated Soil As Directed Within A Lead Of 50 Metres. , Providing And Laying In Position Cement Concrete 1:2:4 (1 Cement : 2 Coarse Sand :4 Graded Stone Aggregate 20 Mm Nominal Size) Including Form Work Etc. As Required. , Providing And Laying In Position Cement Concrete 1:3:6 (1 Cement : 2 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size) Including Form Work Etc. As Required. , Spray Painting With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Manufacturer And Colour To Give An Even Shade For Distribution Boards, Fire Hydrant Pipes, Internal & External Electrical Panels/ Junction Boxes/Feeder Pillars, Etc. Provided In The Terminal Buildings, Technical Block And Other Ancillary Buildings Including Cleaning The Surface, Applying Two Or More Coats Of Primer Wherever Necessary, Removing, Shifting Of Installations From Existing Site To A Suitable Site For Painting Where Ever Required. Scope Also Includes Re-Lettering / New Lettering Of Various Distribution Boards/ Panels Wherever Required. , Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, Depth Up To 1.5 M, Including Getting Out The Excavated Materials, Returning The Soil As Required In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layers By Ramming, Watering Etc., Stacking Serviceable Material For Measurements And Disposal Of Unserviceable Material As Directed, Within A Lead Of 50 M.(A) All Kinds Of Soil For Laying Of Pipes, Cables Etc., Not Exceeding 80 Mm Dia. , Cutting Road/Concrete Including Equipment, Labour Etc. And Disposal Of Material As Directed, Within A Lead Of 50 M. , Hiring Of Crane Of Suitable Capacity Operating Height Of 30 Meter (Minimum) With Working Bucket, Safety Harness Etc. For Replacement Of The Steel Wire Rope Of The 30.5 Meter Monumental National Flag Mast Installed Opposite To Terminal Building Of The Calicut Intl. Airport. (Steel Rope And Labour For Steel Rope Shall Be Provided By Aai.) , Hiring Of Crane Of Suitable Capacity Operating Height Of 30 Meter (Minimum) With Working Bucket, Safety Harness Etc. For Replacement Of The Aviation Obstruction Light Of The 30.5 Meter Monumental National Flag Mast Installed Opposite To Terminal Building Of The Calicut Intl. Airport. (Aviation Obstruction Light And Labour Shall Be Provided By Aai.) , Supply Of Single Dome Integral Led Aviation Obstruction Light Comprising Of Aluminium Housing With Polycarbonate Housing As Per Approved Makes. , Supply And Installation Of Aisi 316 Grade 6 Mm Ss Steel Wire Ropes Suitable For 30.5 M Monumental Flag Mast Installed In Calicut Airport. The Job Includes The Supply And Installation Of 6 Mm Rope On The 30.5 Mtr Monumental Flag Mast. Including Replacement Of Stainless Steel Thimbles, Copper Splicing, Galvanized Turnbuckle Eye And Bull Dog Grips Including Using Suitable Equipments , Tools , Safety Harness Etc. Complete As Required For Replacement Of The Wire Rope Complete As Required. The Job Also Includes Removal Of Existing Wire Ropes From The High Mast. , Replacing The Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)A) 12.50 Hp Jockey Pump , Replacing The Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)B) 25.00 Hp Jockey Pump , Replacing The Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)C) 75.00 Hp Main Fire Pump , Replacing The Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)D) 120.00 Hp Main Fire Pump , Replacing The Non-Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)A) 12.50 Hp Jockey Pump , Replacing The Non-Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)B) 25.00 Hp Jockey Pump , Replacing The Non-Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)C) 75.00 Hp Main Fire Pump , Replacing The Non-Drive End Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)D) 120.00 Hp Main Fire Pump , Replacing Both The Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)A) 12.50 Hp Jockey Pump , Replacing Both The Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)B) 25.00 Hp Jockey Pump , Replacing Both The Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)C) 75.00 Hp Main Fire Pump , Replacing Both The Bearings Of Motor Of Following Capacity And Application Including Decoupling From The Load Side, Dismantling From The Foundation, Loading, Unloading Transportation, Labour Charges, Consumables, Lubricants, Tools, Tackles, Jigs And Implements Etc. Complete As Required Including Refixing, Realignment, Ensuring The Design / Required Parameters Etc. Complete As Required (Damaged Bearing Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)D) 120.00 Hp Main Fire Pump , Replacing The Damaged Rubber Bush Of Following Capacity And Application Pump Motor Sets As Listed Below Including Labour Charges For Dismantling The Coupling, Refixing The Coupling , Ensuring Proper Shaft Alignment Etc. As Requireda) 12.50 Hp Jockey Pump , Replacing The Damaged Rubber Bush Of Following Capacity And Application Pump Motor Sets As Listed Below Including Labour Charges For Dismantling The Coupling, Refixing The Coupling , Ensuring Proper Shaft Alignment Etc. As Requiredb) 25.00 Hp Jockey Pump , Replacing The Damaged Rubber Bush Of Following Capacity And Application Pump Motor Sets As Listed Below Including Labour Charges For Dismantling The Coupling, Refixing The Coupling , Ensuring Proper Shaft Alignment Etc. As Requiredc) 75.00 Hp Main Fire Pump , Replacing The Damaged Rubber Bush Of Following Capacity And Application Pump Motor Sets As Listed Below Including Labour Charges For Dismantling The Coupling, Refixing The Coupling , Ensuring Proper Shaft Alignment Etc. As Requiredd) 120.00 Hp Main Fire Pump , Lifting And Lowering Of Submersible Pump Along With The Installed Pipe From Bore Well ( Up To 400 Feet Max) Including Dismantling The Defective Submersible Motor, Pump Set And Installing The Serviceable Motor Pump Set With The Existing Pipe, Arranging T&P And Necessary Consumables Etc. Complete As Required A) Submersible Pumps Installed With Hdpe/Pvc Pipe , Lifting And Lowering Of Submersible Pump Along With The Installed Pipe From Bore Well ( Up To 400 Feet Max) Including Dismantling The Defective Submersible Motor, Pump Set And Installing The Serviceable Motor Pump Set With The Existing Pipe, Arranging T&P And Necessary Consumables Etc. Complete As Required B)Submersible Pumps Installed With Gi Pipe With Sockets/ Flanges , Lifting Of Defective Submersible Motor Pump Set From Open Well/Sump And Dismantling The Same And Installing The Serviceable Motor Pump Set Arranging T&P And Necessary Consumables Including Lifting And Lowering Into Sump/Open Well Etc. Complete As Required (Serviceable Motor Will Be Provided By Aai). , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing, With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor(Drain Pump)Below 2 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Monoblock Pump Motor-3 Hp (Drain Pump) , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Bore Well)Above 2 Hp And Up To 5 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Bore Well)Above 5 Hp And Up To 10 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Open Well/Sump)Below 2 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Open Well/Sump)Above 2 Hp And Up To 5 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Open Well/Sump)Above 5 Hp And Up To 10 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Open Well/Sump)Above 10 Hp And Up To 15 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Submersible Motor (Open Well/Sump)Above 15 Hp And Up To 17.5 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Monoblock Pump Motorbelow 2 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Monoblock Pump Motorabove 2 Hp And Up To 5 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc And Including To&From Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Monoblock Pump Motorabove 5 Hp And Up To 10 Hp , Rewinding Of Following Type Of Motors With Enamelled/Teflon Coated Copper Wire Varnishing & Baking Along With Gunmetal Bushes, Thrust Bearing With Two Or More Coat Of Synthetic Pu Enamel Paint Of Approved Brand, Etc. And Including To&Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)Monoblock Pump Motorabove 10 Hp And Up To 15 Hp , Servicing Of The Following Capacity Submersible (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Upto 2 Hpthrust Bearing , Servicing Of The Following Capacity Ubmersible (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Upto 2 Hpbushes , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pump Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Upto 2 Hpshaft Sleeve , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pump Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Upto 2 Hpthrust Plate , Servicing Of The Following Capacity Submersible (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpthrust Bearing , Servicing Of The Following Capacity Ubmersible (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpbushes , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pump Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpshaft Sleeve , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pump Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpthrust Plate , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpthrust Bearing , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpbushes , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpshaft Sleeve , Servicing Of The Following Capacity Submersible/Mono Block Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Submersible Motor (Open Well/Bore Well/Sump)Above 5 Hp And Up To 10 Hpthrust Plate , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hp And Up To 15 Hpthrust Bearing , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hp And Up To 15 Hpbushes , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hp And Up To 15 Hpshaft Sleeve , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hp And Up To 15 Hpthrust Plate , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 15 Hp And Up To 20 Hpthrust Bearing , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 15 Hp And Up To 20 Hpbushes , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 15 Hp And Up To 20 Hpshaft Sleeve , Servicing Of The Following Capacity Submersible Motor (Open Well/Bore Well/Sump) Pumps Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 15 Hp And Up To 20 Hpthrust Plate , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Below 2Hpbearing , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Below 2Hpbushes , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Below 2Hpshaft Sleeve , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpbearing , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpbushes , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 2 Hp And Up To 5 Hpshaft Sleeve , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpbearing , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpbushes , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 5 Hp And Up To 10 Hpshaft Sleeve , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hpbearing , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hpbushes , Servicing Of The Following Capacity Monoblock Pump Motor Including Replacing The Following Components And Refixing Back Complete As Required And Making The Pump Suitable For Satisfactory Operation.Above 10 Hpshaft Sleeve , Repairing Of Soft Starter (Make: L&T, Model : Emx3-0145B-V4-C1-H) Used For Fire Fighting Main Electric Pump, Including Repair/ Replacement Of Any Components Like Scr, Control Card, Display Etc. Including Testing And Commissioning Of The Same. The Cost Shall Include To And Fro Transport Of The Soft Starter To The Service Location Of The Specialized Agency/L&T Authorized Centre As The Case May Be. , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)600Mm. Sweep Air Circulators , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)450Mm. Sweep Air Circulators , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)300/380Mm. Sweep Exhaust Fan 900Rpm Heavy Duty , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)300Mm. Sweep Exhaust Fan 1400 Rpm Light Duty , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)1200Mm. Sweep Ceiling Fan , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)400 Mm. Sweep Wall Mounting Fan , Rewinding Of Following Type Of Air Circulators/Ceiling Fans/Exhaust Fans With Enamelled Copper Wire, Baking, Varnishing, Overhauling, Greasing, Refitting Of Motor Etc. And Including To & Fro Transportation Etc. Complete As Required (Burnt Copper Need Not Be Returned To Aai. Rate Shall Be Quoted Accordingly)400 Mm. Sweep Pedestal Fan
|