The Planned Reconstruction Of The Wimiip Workshop Includes Optimization Of The Functional And Utility Layout Of The Rooms, Related To The Need For Ergonomic Use Of Space For The Installation Of New Devices And The Relocation Of Existing Ones. Additionally, The Workshop Will Be Enlarged By Adjacent Rooms And A Fragment Of The Corridor, And Part Of It Is Planned To Be Separated Into A Social Room. Note: The Scope Of Construction Works Also Includes The Implementation Of Mechanical Ventilation And Local Exhaust Systems For The Laboratory Rooms On The First Floor Of The Hall, I.E. 46H, 48H, 50H And 52H. The Detailed Installation Route Was Indicated In The Detailed Design. The Planned Works Should Include, Among Others:1. Construction Works: - Demolition And Demolition Works And Dismantling Of Equipment, - Demolition Of Partition Walls, - Construction Of New Walls And Room Divisions Within The Ground Floor Of Hall H-A2, - Strengthening Of The Ground Within The Rebuilt Rooms, Construction Of A Reinforced Slab With Foundations For Devices, - Construction Of New Floor Layers, - Construction Of Structural Reinforcements Within Walls, Columns, Ceilings And Subfloors (Within The Scope Of The Structural Design), - Steel Structure Of The Mezzanine Along With Fire And Corrosion Protection, - Construction Of Toilets And Social Facilities In The Workshop Space Along With Their Equipment, - Construction Of An External Cage For Technical Gases Of Light Steel Structure With Access, - Installation Of Doors And Aluminum Glazing, - Replacement Of External And Internal Windows In The Hall, - Installation Of Doors In The Designed Walls; - Raising The Floor Of Room 9H In Order To Adjust The Elevation To The Rest Of The Hall, Incorporating Part Of The Corridor Into The Workshop Rooms And Constructing A New Lintel And Raising The Door Opening To The Room - Finishing Works: Drywall, Plaster, Plaster, Painting, - Installation Of Curtains/Window Blinds, - Debris Removal And Disposal2. Electrical Works: - Disassembly Of The Old Electrical Installation, - Construction Of A New Wlz Power Supply From Rg And Zk, - New Electrical Switchboards, - Installation Of 400V, 230V And Computer Sockets, - Installation Of Basic, Emergency And Evacuation Lighting Fixtures, - Installation Of Cable Routes And Ducts, - Power Supply Installations For Ventilation, - Fire Installation, - Structural Installations, - Low-Current Installations Among Others Cctv, Kd, - Electric Shock Protection Installation, - Overvoltage Protection Installation, - Grounding Installation (Main Grounding Bus) - Measurements, Commissioning Of Electrical, Low-Current And Telecommunications Installations. Note: Fire Protection Installation. Made Based On A New Division Of Rooms. The Installation Must Be Able To Be Connected To The Existing Fire Protection System Located Within Hall H-A2;3. Sanitary Works: - Reconstruction Of Water And Sewage Installations, Including: Replacement Of Risers, Levels, Approaches, Valves, Fittin
|