Tenders Are Invited For Bitumen And Asphalt – Delivery Of Mineral-Bituminous Mixtures And Aggregates For The ... in Poland
Tender Notice
TenderID
113940436
Tender Brief
Tenders Are Invited For Bitumen And Asphalt – Delivery Of Mineral-Bituminous Mixtures And Aggregates For The Renovation Of Municipal Roads In Ogonowice And Lubień
Bitumen And Asphalt – Delivery Of Mineral-Bituminous Mixtures And Aggregates For The Renovation Of Municipal Roads In Ogonowice And Lubień. 2. The Subject Of The Order Is: 1) Road Foundation - Purchase And Delivery Of Crushed Aggregate Intended For The Construction Of The Lower Foundation With A Fraction Of 0/31.5 In An Amount Of 8,000 Tons. 2) Pavements - - Purchase And Delivery Of Mineral-Bituminous Grit Mixtures - Ac16w Asphalt Binding Layer With A Thickness Of 5 Cm After Compaction On An Area Of 12,200 M². - Purchase And Delivery Of Ac11s Mineral-Bituminous Mixtures - An Asphalt Wearing Course With A Thickness Of 4 Cm After Compaction On An Area Of 11,550 M². - The Temperature Of The Mineral-Bituminous Mixture During Unloading And Installation Must Meet The Requirements Of The Mixture Manufacturer, Applicable Standards, Technical Documentation And Relevant Technical Specifications For The Execution And Acceptance Of Construction Works. - Due To The Need To Maintain The Technological Parameters Of The Mineral-Bituminous Mixtures And Ensure The Proper Quality Of The Surface, The Transport Time Of The Mineral-Bituminous Mixture From The Moment Of Loading In The Plant To The Moment Of Its Installation Cannot Exceed 1 Hour. The Contractor Is Obliged To Ensure The Organization Of Deliveries, Means Of Transport And Technical Solutions Enabling The Required Quality Parameters Of The Mixture To Be Maintained During Transport And Installation. 3. The Mass Will Be Fed From A Thermos Permanently Mounted On The Truck By Gravity Or Using A Screw Feeder To The Chute. 4. The Design Of The Thermos Should Enable Trouble-Free Gravitational Dosing Of Bituminous Mass Through The Rear Discharge Opening After Lifting The Thermos Box. 5. Each Batch Of Delivered Material Must Be Accompanied By A Current Declaration Of Performance, A Wz Document And A Weight Receipt. 6. Orders For Mass Delivery Will Be Made In Writing, By Phone, Fax Or E-Mail As Needed. The Order Completion Time Is A Maximum Of 14 Days From The Date Of Notification Of The Request By The Ordering Party. 7. For Each Day Of Delay In Delivery, I.E. From The 8Th Day, A Penalty Of Pln 5,000 Will Be Charged. 8. In The Scope Of Supplies Of Mineral-Bituminous Mixtures, The Contractor Is Obliged To Provide, At His Own Expense And Risk, A Paver (Paver) For Bituminous Masses And Appropriate Compaction Equipment (Road Rollers), Along With Operator Support, At The Place Of Installation On Dates Agreed With The Ordering Party. This Requirement Is An Integral Element Of The Subject Of The Contract And Is Not Subject To Separate Remuneration. 9. The Contractors Remuneration Is A Lump Sum And Covers The Execution Of The Entire Subject Of The Order In The Quantitative Scope Specified In This Description Of The Subject Of The Order. The Gross Offer Price Is Calculated By The Contractor As The Sum Of The Products Of Unit Prices And The Quantity Of Materials Specified In The Description Of The Subject Of The Order, Plus The Applicable Vat. Unit Prices Are Used Only To Calculate The Offer Price And To Evaluate Offers And Do Not Change The Lump-Sum Nature Of The Remuneration, Which Is Fixed And Does Not Change With
Contact Information
Contact No.
+48 76 85 82 200
Email
sekretariat.gzgk@legnickiepole.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113940436
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.