|
Puc De Ruas In Unical Subdivision. - Local Construction Administration, Puc De Ruas In Unical Subdivision. - Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps Dimensions (2.40 X 1.20 Meters), Puc De Ruas In Unical Subdivision. - Mobilization/Demobilization Of Equipment, Street Puc In Unical Subdivision. - Rental Of Container 2, 30 - Vertical Excavation For Infrastructure, With Loading, Unloading And Transport Of Soil Of 1 Category, With Hydraulic Excavator (Bucket: 0.8 M / 111Hp), Fleet Of 3 Dump Trucks Of 10 M, Dmt Up To 1 Km And Average Speed 14 Km/H. Af_05/2020, Puc De Ruas In Unical Subdivision. - Regularization And Compaction Of Predominantly Clayey Soil Subgrade, For Pavement Construction Works. Af_09/2024, Puc De Ruas In Unical Subdivision. - Spreading Material With Crawler Tractor. Af_09/2024 (Bota Fora), Puc De Ruas In Unical Subdivision. - Transport With 10 M Dump Truck - Paved Highway (19.2 Km), Puc De Ruas In Unical Subdivision. - Soil-Cement Base Or Sub-Base With 7% Cement And Mixed On The Road With Quarry Material - 100% Modified Proctor (E=20Cm), Street Puc In Unical Subdivision. - Application Of Extra Strong Black Plastic Tarpaulin, E = 200 Microns, Street Puc In The Unical Subdivision. - Shrinkage Reducer - Redutrac Or Similar - Rate Of 8 Kg/M, Puc Of Streets In Unical Subdivision. - Structural Macrofiber - Crf 50/4 Pucad - Rate Of 4 Kg/M, Puc Of Streets In Unical Subdivision. - Transport With Concrete Mixer Truck - Paved Highway, Puc De Ruas In Unical Subdivision. - Concrete Flooring With Small Equipment - Commercial Sand And Crushed Fck 40 Mpa (Fctm, K = 4.5 Mpa) (E= 12Cm) - Supply And Execution, Street Puc In Unical Subdivision. - Transfer Bars, 16.0 Mm Ca-25 Steel, For Executing Concrete Floors - Supply And Installation. Af_04/2022, Puc De Ruas In Unical Subdivision. - Application Of Grease On Transfer Bars For Laying Concrete Floors. Af_04/2022, Puc De Ruas In Unical Subdivision. - Frame For Building A Radiator, Concrete Floor Or Slab On The Ground, Using Q-138 Mesh. Af_09/2021, Puc De Ruas In Unical Subdivision. - Connection Bars, 10 Mm Ca-50 Steel, Street Puc In Unical Subdivision. - Sawn Joint Treatment, With Polyethylene Billet And Silicone-Based Sealant. Af_09/2023, Puc De Ruas In Unical Subdivision. - Concrete Curb - Mfc 05 Molded On Site With Extruder And Machined Concrete - Commercial Sand And Crushed, Street Puc In Unical Subdivision. - Execution Of Contraction Joints For Concrete Floors. Af_04/2022 Filling With Sand, Puc Of Streets In Unical Subdivision. - Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_09/2024, Puc De Ruas In Unical Subdivision. - Mechanized Trench Backfill With Backhoe Loader (Retro Bucket Capacity: 0.26 M/Power: 88 Hp), Width 0.8 To 1, Depth Up To 1, With Soil (Without Replacement) Of 1 Category, With Percussion Soil Compactor Af_08/2023, Puc De Ruas In Unical Subdivision. - Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_0
|