S&T work in c/w (i) Pre and post S&T activities in c/w various ongoing signal & Telecomm work over FZR divis ... in India
Tender Notice
TenderID
113867717
Tender Brief
S&T work in c/w (i) Pre and post S&T activities in c/w various ongoing signal & Telecomm work over FZR division. (ii) Engg. temping machine work at FZR-BTI and FZR-FKA section of FZR Division.
Tender for S&T Work In C/W (I) Pre And Post S&T Activities In C/W Various Ongoing Signal & Telecomm Work Over Fzr Division. (Ii) Engg. Temping Machine Work At Fzr-Bti And Fzr-Fka Section Of Fzr Division. , - Shifting & Maintenance Of Signalling Equipments During Different Ongoing Works I.E. Replacement Of Uac Based Bpac With Ufsbi, Replacement Of Hard Reset Type Axle Counters & Provision Of Dual Detection In Block Working Etc. Activities Are As Follows: Opening And Refixing Of Dc Track Circuit Jumpers / Axle Counter Transducers During These Works. It Also Includes Drilling Hole In Rails As Per Site Requirement, Any Work Of Electric Operated Lifting Barriers (Eolb) Or Sliding Boom And Earthing Arrangement Of Signalling Gears, Any Other Work As Per Instruction Of Railway Engineer. All T&P & Jigs Required To Execute The Work Will Be Supplied By The Contractor. The Team To Be Provided For This Work Should Comprise Of: Fitter -1 No., Blacksmith -1 No., Mason /Carpenter - 1 No. And Helpers - 5 Nos. (Note: Unit For This Item May Be Read As Per Day Per Team) (Qty. Is Taken As 3 Nos. Of Teams X 365 Days = 1095 Team Days) (Inspection: Consignee) , - Shifting & Maintenance Of Telecom Equipmens During Different Ongoing Works I.E. Replacement Of Uac Based Bpac With Ufsbi, Replacement Of Hard Reset Type Axle Counters & Provision Of Dual Detection In Block Working Etc. Activities Are As Follows: Excavation And Levelling Of Earth In Block Section, Jointing Of Quad Cable Work During Cess Repairing And Other Works, Cleaning Of Batteries, Chargers And Painting Of Telecom Equipments. It Also Includes Drilling Hole In Rails As Per Site Requirement, Any Other Work As Per Instruction Of Railway Engineer. All T&P & Jigs Required To Execute The Work Will Be Supplied By The Contractor. The Team To Be Provided For This Work Should Comprise Of: Wireman -1 No. And Helpers - 3 Nos. (Note: Unit For This Item May Be Read As Per Day Per Team) (Qtys. Is Taken As 4 Nos. Of Teams X 315 Days = 1260 Team Days) (Inspection: Consignee)
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113867717
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.