Works For Complete Or Part Construction And Civil Engineering Work – Conversion And Renovation Of South Altötting Primary School Arc_Lv03_Baumeisterarbeiter. - Construction Site Equipment Including, Among Other Things, Break Containers, Washrooms And Toilet Rooms, Approx. 215 M Of Construction Fence, Water Supply System, Fall Protection, Approx. 21 M Of Pedestrian Tunnel And 366 M³ Of Gravel Areas For Construction Site Equipment, Construction Site Power Distributor, Construction Site Lighting - Demolition Work On External Areas: Approx. 84 M Of Steps And Walls, Approx. 754 M Of Path Borders, Approx. 1,000 M² Of Paving And Epdm, Approx. 1,000 M² Of Topsoil, Dismantling Sports And Playground Equipment - Demolition Work On Existing Buildings: 22 Door And Window Openings, 9 Doors Moving And Height Change, Approx. 110 Tga Openings, Demolition Of Approx. 111 M² Of Sub-Concrete - Earthworks: Approx 1.1/ Vk 1/Z 2, Approx. 17 M³ Of Earth Excavated In The Building - Drainage Channel Work Outside And Underneath New Floor Slabs Approx. 453 M, 136 M Under Existing Floor Slab - Approx. 142 M³ Hdi Underpinnings - Approx. 650 M Earthing System For Sports Hall - Concrete Work, Partly With Exposed Concrete Requirement: Approx. 926 M² Floor Slabs Of In-Situ Concrete, Wu, Approx. 385 M² Of Waterproof External Walls, Approx. 546 M² Of In-Situ Concrete External Walls, Approx. M² Of Internal Walls, Approx. 32 M Of Round Columns, Approx. 871 M² Of Reinforced Concrete Ceilings, Approx. 400 M² Of Double Wall Elements, Approx On-Site Wooden Support, Prefabricated Staircases Over 1 Or 4 Floors - Concrete Work In The Existing Building: 2 Pieces Of Internal Supports Including Foundations, Approx. 106 M² Floor Slab In The Building As An Addition Or Approx. 207 M² Flat Floor Slab, Approx. 45 M² Of New Reinforced Concrete Ceilings, Approx. 26 M² Of Closing Openings, Approx. 135 M Of Reinforced Concrete Lintels Over Window Openings, Approx. 140 M Of Internal Supports And Pillars - Masonry Work: Approx. 404 M² Of Masonry In Various Thicknesses, Approx. 134 M² Of Brickwork Added/Added To - Insulation Work: Approx. 1,243 M² Of Perimeter Insulation Xps - Plastering Work: Approx. 2,656 M² Of Internal Plaster, Approx. 846 M² Of Floor Slabs, Approx. 1,134 M² Of External And Internal Walls And Approx. 1,004 M² Of Ceilings Made Of In-Situ Concrete
|