|
Tender for Carriage Of Following Material From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. , Plain Cement Concrete Pole 8.5 Mtr.Long , Steel Tubler Pole Sp-55 11.00 Mtr. , A.C.S.R. Weasel Conductor , 11 Kv Composite Polymer Pin Insulator , 11 Kv Polymer Disc Insulator (T&C) 45 Kn & Fiting , Ms T-Off Channel 100X50x5x1300 Mm , 11 Kv Gaurding Ms Angle 65X65x6 , Gi Wire 6 Swg , Gi Wire 8 Swg , Earthing Complete , Cross Arms V-Type 11 Kv , Stay Complete , Supply & Erection Of Following Material As Per Uppcl/Dvvnl/ Respo Norms And Standard/Related Is (Note: All Petty Item Required For Proper Completion Of Work Will Be By Provided By The Contractor Free Of Cost.) , Stone Pad 300X300x75mm , 11 Kv Cross Arm Clamp For Plain Cement Concrete Pole 8.5 M , 11 Kv F Clamp For Plain Cement Concrete Pole 8.5 Mtr Long , Garding Clamp /Holding With N&B , T- Off Clamp For 8.5 M Plain Cement Concrete Pole , Barbed Wire , Barbed Wire Clamp For Plain Cement Concrete , Nut & Bolt , Danger Board With Nut & Bolt , Al. Pg Clamps Weasel To Weasel , Number Plate With Clamp , N&B , Erection Of Following Material Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. (With Proper Earthing.) , Erection Of Plain Cement Concrete Pole 8.5 Mtr Long Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Plain Cement Concrete Pole 8.5 Mtr Long As Per Respo Norms ( Cement, Sand , Blast Stone With The Ration 1:4:8 Will Be Provided By Contractor ) , Grouting Ofstp Pole 11 Mtr Long As Per Respo Norms ( Cement, Sand , Blast Stone With The Ration 1:4:8 Will Be Provided By Contractor ) , Grouting Of Stp Pole 11 Mtr Long As Per Respo Norms ( Cement, Sand , Blast Stone With The Ration 1:4:8 Will Be Provided By Contractor ) , Fixing Of Stay Rod And Its Erection. Stay Wire Should Be Properly Binded And Tightened As Per Standard Specification. , Grouting Of Stay Set As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T & P Etc. Required For Proper Completion Of Work. , Laying & Erection Of Acsr Weasel Conductor As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carries Etc. Required For Proper Completion Of Work. , 11 Kv Composite Polymer Pin Insulator , 11 Kv Polymer Disc Insulator (T&C) 45 Kn & Fiting , Ms T-Off Channel 100X50x5x1300 Mm , 11 Kv Gaurding Ms Angle 65X65x6 , Gi Wire 6 Swg , Gi Wire 8 Swg , Earthing Complete , Cross Arms V-Type 11 Kv , Concreting Of Support Stp/Pole Muffing (0.268 Cum) , Dismantling Of Existing Line/ T/F And Removal Of All Accessories & Fittings From Poles, Re-Rolling Of Conductor And Proper Stacking And Cartage Of Dismantled Conductor & Accessories From Site Of Work To Dvvnl, Store.
|