|
Tender for Providing And Constructing Temporary Island 11M Diameter For Construction Of Well Foundation For 5.50M Dia Well. , Cutting Edge Of Mild Steel Providing And Laying Cutting Edge Of Mild Steel Weighing 40 Kg Per Metre For Well Foundation Complete As Per Drawing And Technical Specification. , Reinforced Cement Concrete Work In M-25 In Well Curb With Cement , Approved Coarse Sand & 2 Cm. Gauge Well Graded Grit Including Necessary Shuttering , Placing And Fixing Of Reinforcement Including Its Binding With Wire But Excluding Cost Of Reinforcement And Also Including Supply Of All Materials, Labours T&P Etc. Required For Proper Completion Of The Work. , Reinforced Cement Concrete Work In M-25 In Well Steining With Cement , Approved Coarse Sand & 2 Cm. Gauge Well Graded Grit Including Necessary Shuttering , Placing And Fixing Of Reinforcement Including Its Binding With Wire But Excluding Cost Of Reinforcement And Also Including Supply Of All Materials, Labours T&P Etc. Required For Proper Completion Of The Work. , Sinking Of Wells 5.00Mtr. External Dia Through All Kinds Of Sand Silt, Clay Except Hard Stratum Like Kankar, Boulders, Rocks Only Below The Low Water Level Including Loading And Unloading Of Weight And Pumping Out Of Water Including Necessary T&P Machines, Labour Etc. Was Required For Proper Completion Of The Work (0.00 Meter To 3.00 Meter) , As Per Item No. 5 But 3.00 Meter To 10.00 Meter. , As Per Item No. 5 But 10.00 Meter To 15.00 Meter. , cement concrete Work In M-25 In Bottom Plugging Of Well With Cement, Approved Coarse Sand And 2Cm Gauge Well Graded Grit Including Necessary Shuttering, Placing & Fixing Of Reinforcement Including Its Binding With Wire But Excluding Cost Of Reinforcement & Also Including Supply Of All Materials, Labours T&P Etc. Required For Proper Completion Of The Work. , cement concrete Work In M-20 In Intermediate Plugging Of Well With Cement , Approved Coarse Sand And 2Cm Gauge Well Graded Grit & Also Including Supply Of All Materials , Labours T&P Etc. Required For Completion Of The Work , Sand Filling In Side The Well Between Bottom And Top Plugging Including Watering Ramming And Also Including Necessary T&P Etc. Required For Proper Completion Of Work (Labour Only) , Reinforced Cement Concrete Work In M-25 In Well Caps With Cement Approved Coarse Sand & 2Cm Gauge Well Graded Grit Including Necessary Shuttering Placing & Fixing Of Reinforcement Including Its Binding With Wire But Excluding Cost Of Reinforcement And Also Including Supply Of All Materials, Labours T&P Etc. Required For Proper Completion Of The Work. , Reinforced Cement Concrete Work In M-30 In Substructures With Cement, Approved Coarse Sand & 2Cm. Gauge Well Graded Grit Including Necessary Shuttering ,Placing And Fixing Of Reinforcement And Also Including Supply Of All Materials, Labours T&P Etc. Required For Proper Completion Of The Work. , Furnishing And Placing Rcc/Psc M-35 In Superstructure As Per Drawing And T.S. With Cement Approved Coarse Sand & 2Cm Gauge Well Graded Grit Including Necessary Shuttering , Placing & Fixing Of Reinforcement Including Its Binding With Wire But Excluding Cost Of Reinforcement & Also Including Supply Material , Labour And T&P Etc. Required For Proper Completion Of The Work , Providing And Laying Cement Concrete Wearing Coat M-30 Grade Including Reinforcement As Per Mort&H Specifications 2702 Complete As Per Drawing And Technical Specifications , Hysd Steel Or Iron Work In Well Steining ,Well Cap, Abutments And Their Caps, Slabs, Curbs Etc. Brought To Required Shape Including Cutting, Bending & Also Including Cost Of Necessary Reinforcement For Proper Completion Of Work. (In Foundation) , As Per Item No. 15 But In Substructure , As Per Item No. 15 But In Superstructure , Plain Cement Concrete Below Aaproach Slab With 2 Cm Gauge Approved Stone Ballast , Approved Coarse Sand And Cement In The Proportion Of 1:2:4 Including Supply Of All Material, Labour And T&P Etc. Required For Proper Completion Of Work As Per Sor Ch.5-7(4.1) , M-30 Grade Reinforced Cement Concrete In Approach Slabs As Per Drawings And Clause 1200,500&1700 Of Morth Specifications (2001) , Supplying Fitting & Fixing In Position To Line And Level Elastomeric Bearing Of Approved Company/ Manufacturer Conforming To Irc : 83(Part-Iii) Section-Ix And Clause 2005 Of Morth Specifications Complete Including All Accessories As Per Drawing And Technical Specification. , Providing And Laying Of A Strip Seal Expansion Joint Catering To Maximum Horizontal Movement Upto 70 Mm, Complete As Per Approved Drawings And Standard Specifications To Be Installed By The Manufacturer/Supplier Or Their Authorised Representative Ensuring Compliance To The Manufacturers Instructions For Installation. , Cement Concrete With 4 Cm Gauge Approved Stone Ballast , Approved Coarse Sand And Cement In The Proportion Of 1:4:8 Including Supply Of All Material, Labour And T&P Etc. Required For Proper Completion Of Work In V.T. Base As Per . Sor Ch.5-3(4.1) , Supplying & Fixing Of 100Mm Dia Drainage Spouts Complete As Per Drawing And Technical Specificationwork. 2705 , Construction Of Embankment With Approved Material Obtained From Borrow Pits With All Lifts And Leads Up To 2 Km, Transporting To Site, Spreading, Grading To Required Slope And Compacting To Meet Requirement Of Table 300-2. , Construction Of Granular Sub-Base By Providing Close Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Front End Loader At Omc, And Compacting With Vibratory Roller To Achieve The Desired Density, Complete As Per Clause 401 , Providing, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers With Grader In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density. , Providing And Applying Tack Coat With Bitumen Vg-10 Grade Using Bitumen Distributor At The Rate Of 0.35 Kg Per Sqm On The Prepared Granular Surfaces Treated With Primer & Cleaned With Hydraulic Broom As Per Technical Specification Clause 503. , Providing And Laying Dense Graded Bituminous Macadam With 100-120 Tph Batch Type Hmp Producing An Average Output Of 75 Tonnes Per Hour Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder @ 4.50 Per Cent By Weight Of Total Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Clause No. 505 Complete In All Respects. , Providing And Laying Bituminous Concrete With Higher Capacity Batch Type Hot Mix Plant Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder Vg-30 @ 5.4 Per Cent Of Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Clause No. 507 Complete In All Respects , Providing And Laying Filter Material Underneath Pitching In Slopes Complete As Per Drawing And Technical Specification As Per Mort&H Specification 2504 , Providing And Laying Pitching On Slopes Laid Over Prepared Filter Media Including Boulder Apron Laid Dry In Front Of Toe Of Embankment Complete As Per Drawing And Technical Specifications As Per Mort&H Specification 2504
|