1. The Subject Of The Order Is The Thermal Modernization Of The Primary School Building In Wola Rzeczycka.1.1. The Scope Of The Task Includes: • Preparatory Works • Insulation Of Foundation Walls • Reconstruction Of The Concrete Block Band • Insulation Of External Walls • Insulation Of The Ceiling On The Top Floor • Tidying Up The Area 1.2. The Contractor Is Obliged To Secure The Construction Site Against Access By Unauthorized Persons, Conduct Works In A Way That Enables Users To Perform Their Tasks Throughout The Entire Period Of Work, And Tidy Up The Property Area. 2. Order Completion Date: Up To 2 Months From The Date Of Signing The Contract.3. The Implementation Of The Subject Of The Order Also Includes: - Preparation And Security Of The Construction Site, Liquidation Of The Construction Site After The Completion Of The Subject Of The Order, - Organization Of Construction Facilities, Performing All Cleaning Works, Including The Ongoing Removal Of Unnecessary Materials And Waste, Segregation, Storage And Disposal Of Waste, - Performing All Auxiliary And Accompanying Works That Are Necessary For The Proper Performance Of The Works Included In The Bill Of Quantities, Including Works Resulting From The Technical Specifications And Design Documentation, - Performing All Other Works, Activities, Obligations And Requirements Arising From The Swz, Technical Specifications, Design Documentation, Bills Of Quantities, As Well As Those Not Included In The Above-Mentioned Documentation And Resulting From The Specificity Of The Subject Of The Order, - Supplying The Construction Site With Electricity, Water, Heat And Other Utilities Necessary To Perform The Order, Along With Bearing The Costs Of Their Collection For Construction Purposes, Including The Costs Of Solid And Liquid Waste Disposal, - Obtaining All Permits, Decisions And Documents Necessary For The Ordering Party To Use The Facility, - Carrying Out Tests, Inspections And Tests, Obtaining Conditions, Consents And Opinions Necessary To Perform The Works, - Performance Of Other Works And Activities That Were Foreseeable At The Stage Of Preparation Of The Offer, Resulting From The Construction Law, Polish Standards, Principles Of Construction Knowledge And Art, - Keeping A Construction Log And Taking Measurements Of Completed Works, - Preparing The Final Settlement Of The Works, - Performing Geodetic And Geotechnical Works (If Required) - Performing An As-Built Geodetic Inventory Of The Facility - 2 Copies (If Required), - Preparation And Submission Of As-Built Acceptance Documentation - 2 Copies, - Preparation And Approval Of Traffic Management Designs For The Duration Of The Works, Marking Of The Works In Accordance With The Approved Traffic Management Design For The Duration Of Construction, Maintenance Of The Markings During The Works, Removal Of Marking Elements And Traffic Safety Devices After The Completion Of The Works - If Required.4. During The Execution Of The Order, Materials And Product
|