|
Description Of The Subject Of The Order1. Scope Of Renovation: A) Hot Mineral-Bituminous Mass (From A Paving Machine) With A Patch Area Of Up To 15 M2 - Preparatory And Measuring Works, Marking Of The Works, Delivery Of Materials To The Work Site, Cleaning Of Damaged Places With Cutting Of A Regular-Shaped Patch, Removal Of Rubble To The Landfill, Sprinkling The Pothole With Binder Along With Applying A Bituminous Expansion Tape On The Edge Of The Patch And Spreading The Mixture Mineral-Bituminous Mass In One Or Two Layers Depending On The Depth Of Damage, Maintaining The Road Grade, Mechanical Compaction Of Individual Layers Of The Laid Mixture; B) Hot Mineral-Bituminous Mass According To Graphic Attachments No. 1 - 17 To The Swz - Preparatory And Measuring Works, Marking The Works, Delivering Materials To The Work Site, Milling, Removing Rubble To The Place Indicated By The Ordering Party, Sprinkling The Upper Layer With Binder Pavement, The Use Of Polyester Mesh With The Use Of An Expansion Joint Tape On The Edge Of The Patch Axis And Spreading The Mineral And Bituminous Mixture In One Layer While Maintaining The Road Grade, Mechanical Compaction Of The Layer Of The Laid Mixture; C) Adjustment Of The Sewage Well (Without Replacing Cast Iron Elements) According To Graphic Attachments No. 1-17 To Swz - Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Work Site, Cleaning Damaged Places, Removing Rubble To The Landfill, Adjusting The Complete Cast Iron Manhole Using Quick-Setting Masses Resistant To Loads And Acidic Environments Or Using Rubber Underlays Or Using Both Technologies At The Same Time, Sprinkling The Pothole With Binder And Applying A Bitumen Expansion Tape On The Edge Of The Cast Iron Body Of The Well, Spreading The Mineral-Bituminous Mixture In One Layer While Maintaining The Road Grade, Mechanical Compaction Of The Layer Placed Mixture; D) Adjustment Of The Street Gully (Without Replacing Cast Iron Elements) According To Graphic Annexes No. 1 - 17 To Swz - Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Work Site, Cleaning Of Damaged Places, Removal Of Rubble To The Landfill, Adjustment Of The Cast Iron Body Of The Gully Using Quick-Setting Masses Resistant To Loads, Sprinkling The Pothole With Binder And Applying It On The Edge Cast Iron Inlet Body Of A Bitumen Expansion Tape, Spreading The Mineral And Bituminous Mixture In One Layer While Maintaining The Road Grade, Mechanical Compaction Of The Layer Of The Laid Mixture; E) Adjustment Of The Water Supply Valve (Without Replacing Cast Iron Elements) According To Graphic Attachments No. 1 - 17 To Swz - Preparatory And Measuring Works, Marking Of Works, Delivery Of Materials To The Work Site, Cleaning Of Damaged Places, Removal Rubble To The Landfill, Adjusting The Cast-Iron Valve Body, Sprinkling The Pothole With Binder And Applying A Bitumen Expansion Tape On The Edge Of The Cast-Iron Valve Body, Spreading The Mineral-
|