1. The Subject Of The Order Is The Expansion Of The Building Of A Public Primary School, Located On Plot No. 192/2 In The Town Of Janików, With 2 Classrooms, A Kitchen With A Canteen, Toilets For Students And Staff, A Pedagogical And Psychological Office, A Cloakroom, And A School Management Room. The Scope Includes Comprehensive Execution Of Works Related To The Implementation Of The Task, Including Preparatory/Auxiliary, Demolition, Accompanying, General Construction And Installation Works, Equipping The Facility With Equipment And Devices Ensuring The Use Of The Facility In Accordance With Its Intended Purpose, Preparation Of As-Built Documentation, Maintenance And Surveying Inventory, And Notification Of The Completion Of Works In Accordance With The Requirements Of The Construction Law.1.1. The Task Includes: 1) Demolition, Cleaning, Earthworks, Tree Cutting, 2) General Construction Works, Including In Particular Building Structures, Insulation, Masonry Works, Window And Door Joinery, Interior And Facade Finishing Works, 3) Hardening Of The Area Around The Building, 4) Creation Of Green Areas - Lawns And Plantings, 5) Construction Of Fencing, 6) Delivery And Installation Of Equipment For The Facility, Including Kitchen Equipment With Catering Facilities, 7) Electrical Works, Including: A) Power Supply And External Lighting, B) Power Supply And Installation Of Electrical Switchgears, C) Electrical, Emergency And Evacuation Installations D) Kitchen Power Installations, E) Ventilation Electrical Installations, F) Structured Cabling Installations, Including Calling Systems, G) Installation Of External And Internal Video Cameras, H) Lightning Protection Installation With Complete Automation, Cabling And Accessories, 8) Sanitary Installations, Including Including: A) Mechanical Supply And Exhaust Ventilation With Air Heating, B) Boiler Room Technology, Including Central Heating, C) Cold And Hot Water And Circulation, D) Fire Protection Installation, E) Sanitary Sewage Installation, With Complete Equipment, 9) Obtaining The Arrangements And Permits Required By Law, Including Those Related To Changes Introduced During The Implementation Of The Task, Notifications, 10) Cleaning Works, 11) Possible Removal Collision Of The Existing Infrastructure With The Planned Project, 12) Carrying Out The Required Regulations: Regulation Of Systems, Efficiency Measurements, Tests, Including Tightness Tests Of Devices And Installations, Flushing Of Installations, Tests, Commissioning Of Installations, 13) Preparation Of As-Built Documentation, Including Changes Introduced By The Technological Design Of The Canteen And As-Built Geodetic Inventory, 14) Training The User In The Use Of Built-In Devices And Installations, 15) Ensuring Service And Periodic Inspections During The Warranty Period Performed Works, Devices And Installations In Accordance With The Recommendations Of The Manufacturers Of The Installed Devices, 16) Other Works And Works Necessary To Perform The
|