The Following Activities Are Expected To Be Carried Out As Part Of The Order (Design And Thermal Modernization Works, In The Field Of Energy Efficiency): Stage 1. Preparation Of Design Documentation For The Scope Of The Task Listed Below. The Requirements And Scope Of Preparation Of Design Documentation Are Included In The Functional And Utility Program. The Functional And Utility Program Contains A Scope Of The Order That Is Larger Than The Scope Of The Order Planned For Implementation. Stage 2. Carrying Out Work To Improve The Energy Efficiency Of The Building: - Insulating The Roof With An Area Of Approx. 450 M2; - Insulation Of The Ceiling Under The Attic With An Area Of Approx. 191.40 M2 By Laying Mineral Wool; - Replacement Of Window Joinery With An Area Of Approx. 148.67 M2 For Windows With A Transmission Coefficient U = 0.9 W/M2k, In Accordance With Conservation Guidelines, Technical Approvals And Manufacturers Recommendations. - Replacement Of Doors With An Area Of Approx. 43.26 M2 For Doors With A Penetration Coefficient Of U = 1.3 W/M2k, In Accordance With Conservation Guidelines, Technical Approvals And Manufacturers Recommendations; - Modernization Of The Central Heating Installation: Replacement Of Pipelines, Radiators With Plate Ones, Installation Of Valves With Thermostatic Heads, Radiator Shut-Off Return Valves, Sub-Vertical Balancing Valves, Automatic Air Vents, Regulation Of The Installation; - Installation Of Air Heat Pumps With Full Fittings And Equipment, - Adaptation Of The Room For A New Boiler Room, Adapting It To The Dimensions. Fire Protection - Replacement Of Internal Lighting With Led And Replacement Of The Electrical Installation. - Installation Of A Pv Installation For The Operation Of The Building, - Installation Of Photovoltaic Panels With A Capacity Of 10 Kw, - Connection Of The Building To The Municipal Heating Network With A Length Of Approx. 450 Meters From The Existing Gas Boiler Room In The Building At Ul. Szkolna 13. The Ordering Party Allows The Station Building To Be Supplied With Heat From The Boiler Room At Ul. Szkolna 11, If The Contractor Demonstrates At The Design Stage That There Is A Reserve Of Heat Energy That Can Be Generated In This Boiler Room. The Type Of Heat Pump And Its Power Will Be Selected By The Designer (Design And Build Formula). The Ordering Party Allows A Technology For The Construction Of Central Heating Pipelines Other Than Pe-Rt, Provided That The Other Solutions Used Have No Worse Technical And Operational Parameters. Carrying Out Other Works Not Related To Energy Efficiency: - Adaptation Of The Building To The Needs Of People With Disabilities - Installation Of An Internal Passenger Lift, Adapted To The Needs Of People With Disabilities, - The Order Includes The Design And Implementation Of The Installation Of External Lighting Mounted On The Walls Of The Building, - The Order Includes Brickwork And Carvings, Only To The Extent Necessary For The Installation Of An Internal Pass
Contact Information
Address
Gmina Miejska Piechowice,Piechowice,58-573,Dolnośląskie,Pl515 - Jeleniogórski
Contact No.
757548900
Email
sekretariat@piechowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 113706166
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.