1. The Subject Of The Order Is Improvement Of The Efficiency Of Water And Sewage Management For The Needs Of The Ujście Warta National Park Through The Construction Of A Water Supply Network Connection And A Pressure Sewage Network Connection With The Accompanying Technical Infrastructure To The Building Of The Warta Mouth National Park Management, Which Includes, Among Others: 1.74 Km And A Gravity Sanitary Sewage Network With A Length Of 0.07 Km),2) A Water Supply Network With A Length Of 1.79 Km Will Be Built. The Order Includes The Implementation Of A Complete And Functional Water And Sewage Infrastructure System With Energy Supply. The Above-Mentioned. The Investment Will Be Implemented On Plots No. 5, 8/8, 8/12, 11/2, 11/4 And 7/3 (Closed Area), District 0001 Górzyca, Registration Unit 080502_2 Górzyca And On Plots 68/65, 68/75, 69/18, 77/1, 83/1, 83/4, 83/5, 84/3, 87/1, 87/8, 87/9 And 82 (Closed Area) District 0006 Stare Miasto, Registration Unit 080101_1 Kostrzyn Nad Odrą. Note: The Route Of The Planned Distribution Water Supply Network And The Connection Of The Sanitary Sewage System Intersects With The Railway Line No. 273 Located On Plots No. 7/3, Precinct 0001 Górzyca, Registration Unit 080502_2 Górzyca, And On Plot No. 82, Precinct 0006 Stare Miasto, Registration Unit 080101_1 Kostrzyn Nad Odrą. This Is An Area Of Closed Land.2. Detailed Scope Of Works Regarding, Among Others: 1) Preparatory Works, Including Geodetic Marking Out Of The Network Route In The Field, 2) Execution Of Earthworks, 3) Laying Of A Pipeline Made Of Pe Pipes Ø 110 Mm, Ø 75 Mm And Pvc Pipes Ø 160 Mm, 4) Construction Of A Well With A Water Meter, 5) Construction Of A Fire Hydrant (2 Pcs), 6) Construction Of A Pumping Station Sewage,7) Construction Of An Energy Connection To The Sewage Pumping Station,8) Construction Of An Expansion Well And Inspection Wells,9) Tightness Test Of Water Supply Networks, Disinfection Of Water Supply Network Pipelines,10) Water Tightness Test Of Sewage Pipe Channels,11) Restoration And Restoration Of The Areas To Their Original Condition. In Addition, As Part Of The Implementation Of The Subject Of The Order, The Contractor Will: 1) Develop A Material And Financial Schedule For The Implementation Of The Investment, 2) Will Be Responsible For The Entire Order, Including For The Course And Timely Execution Of The Order, For Quality, Compliance With The Technical And Quality Conditions Specified For The Subject Of The Order, 3) Participation In Construction Councils. During The Meeting, Information On The Progress Of The Works Will Be Provided And Current Issues Related To The Implementation Of The Subject Of The Order Will Be Resolved, 4) During The Warranty And Guarantee Period, To Participate In Organized Inspections Of The Facility And Each Time In The Event Of Defects, 5) Bearing Full Responsibility For Damage Caused By His Own Employees As A Result Of Failure To Comply With Health And Safety Regulations, 6) Accepting Responsibili
|