|
Job 1- Half Cane Channel In Concrete D=30Cm, Job 1- Fv.15/16 - Closing Wall In Blocks And Concrete Structure, Foundation With Drills, Job 1- General Coordinator, Job 1- Senior Engineer/Architect, Job 1- Junior Engineer/Architect, Job 1- Full Engineer/Architect, Job 1- Designer, Job 1- Designer Designer, Project 1- Sector Coordinator, Project 1- Consultant, Project 1- Cadist Designer, Project 1- Site Engineer, Site 1- Soil/Paving Laboratoryist, Site 1- Laboratory Assistant, Site 1- Topography Assistant, Site 1- Surveyor (Sgsp), Site 1- Mechanical Excavation, Loading And Removal Of Earth Up To An Average Distance Of 1.0 Km, With A 10M3 Dump Truck, Work 1- Earth Supply, Including Excavation, Loading And Transport Up To An Average Distance Of 1, Measured In The Compacted Landfill, Work 1- Earth Compaction, Measured In The Landfill, Work 1- Solid Waste Disposal Rate In Landfill, Type Soil/Earth, Work 1- Rachão Foundation, Work 1- Bica Corrida Base, Work 1- Removal Of Earth Beyond The First Km, With 10M3 Truck, Work 1- Popular Car 50% In Operation, Work 1- Ihd.23 - Crushed Stone Ballast And Stone Dust, Work 1- Ihd.23 - Concrete Ballast Fck: Plug For Stormwater Gallery - Articulated, Except Supply Of Cap, Job 1 - Supply Of Cap - Ductile Cast Iron Grate Minimum Class 400 (40T) D=600Mm - Nbr 10160 Articulated - For Gal. Rainwater, Work 1- Supply And Application Of Ca-50 Steel - Diameter ≫ Or = 1/2, Job 1- Supply And Application Of Machined Concrete Fck=30.0Mpa, Job 1- Supply And Placement Of Geotextile Blanket With Longitudinal Tensile Strength Of 14Kn/M And Transverse Tensile Of 12Kn/M In Expansion Joint, Job 1- Supply Of Pre-Fabricated Concrete Stave Reinforced, Section 3.00 Demolition Of Simple Concrete, Job 1- Demolition Of Reinforced Concrete, Job 1- Loading And Removal Of Rubble Up To An Average Round Trip Distance Of 1Km, Job 1- Removal Of Rubble Beyond The First Km
|