|
Main Stage - 4 Nights 16X14 Stage With Q50 Ceiling, And The Entire Stage With Black Brite Sound Closure And Red Carpet, 2 Service Areas, One On Each Side Measuring 8X4 Both With Side Closure In Tarpaulins And Carpeted, One Of The Areas With Side Closure And Mesh Cover Isolating Access To The Stage, Stairs On Both Sides Of The Stage Both Next To The Areas Service, Haus Mix 3X5 Double With Ceiling On The Second Floor, And Raised Floor All Aluminum Structure And Closing Covered With Red Mesh. Top Front, 16M Line To Climb Separately From The Stage Ceiling, 2M Distance From The Wings And Soon After 4M Test Following The Height Of The Stage, And With Hoists To Raise The Side Led, All Aluminum Structure Covered With Red Mesh, T-Shaped Walkway, Leaving With 6M And The Front Also With 6M All With Red Carpet And All Stage Red Skirt ., 360° Stage - 4 Days 6X6 Table 1M High, With 7X7 Grid And 3 Lines, Service Area 6M Front Entrance In Size 16X2 With A Height Of At Least 3M And An Entire Aluminum Structure Covered In Red Mesh. 8 6X6 Witch Hat Tents, All With Side Closures, Black Floor And Carpet, All With Electrical Parts Already Fitted With Lamps And 5 Sockets., 10X10 Tent - 4 Days Of 08 10X10 Witch Hat Tents, All Fitted To Each Other With Hoist., Railing - 4 Days Of 400 M Of Railing All Covered With Red Mesh On Both Sides, Grids With Locks To Fit Each Other, All Of The Same Size And Model So That There Is No Difference In Fitting., Barricade – 4 Days Of 50M Aluminum Color Barricade Well Preserved., Closing Plates – 4 Days Of 220 M Closing Plate, All Plates Covered With Black Mesh On Both Sides., Pm Security Space - Security Area For Pm Size 6X6, Two Floors Raised At Minimum 2M High, Q30 Structure With Roof And Guardrails On Both Floors, With The 1St Floor 20Cm And Second Floor Access With Ladder And The Entire Aluminum Structure Covered With Red Mesh, 4 6X2 Headboards For Banner Installation., Q50 Coverage – 04 Daily Coverage 20X40 All Aluminum Q50, 2 Waters, Red Mesh Cover., Main Stage Sound – 4 Daily Pa System For Main Stage 30 Lines 2X10 2Xti Pa12 Lines 2X10 2 Sd8monitor Table1 Pm5drh1 Dm71 Cl540 Meters Of Passa Cabogrid 14X12 All In Q50 With 6 Overhead Lines 6 Ceiling Foot Of 7 Meters And Goal Behind The Grid In Q50 With 3 Ceiling Foot Of 7 Meters30 Practicable All With Feet With Wheelsmonitor And Lighting System Following 100% The Artists Rider Including Led Panel., 360° Stage Sound - 4 Daily Sound And Light System For 360° Stage8 Pa Towers With 9 Lines 2X10 2Xti 24 Sub 2X18 Tg 1500Wts2 Side Systems 4 Sub 2X18 Tg 1500Wts And 6 Lines 2X10 2Xti In Each System 12 Sm400 Monitors Original2 Cubo Guitar Fender Twin Reverb 1 Cubo Bass 4X10 1X152 Sub With 2X1812 Practicable With Wheels12 I Near Complete Channels4 Mi
|