|
1. The Subject Of The Order Is A Service Consisting In The Preparation Of Design And Cost Estimate Documentation For The Comprehensive Reconstruction Of The Municipal Stadium In Łapy (Division No.: 1870/46, 1864).2. The Scope Of The Study Includes In Particular The Following Elements Of The Stadium And The Accompanying Infrastructure, I.E.: - Reconstruction Of The Side Football Pitch (Pitch No. 2) With A Synthetic Grass Surface And Lighting, Dimensions 100 M X 64 M, Along With Portable Stands, - Renovation Of The Turf On Pitch No. 1, Dimensions 100 M X 64 M, - Construction Of A Natural Football Pitch No. 3 For The Games Vintages, Among Others Orlik And Młodzik With Dimensions Of 70 × 54 M, Along With Portable Stands, - Reconstruction Of The Existing Eight-Lane Running Track Into A Four-Track Circular Running Track, 400 M Long, With A Polyurethane Surface, Along With The Construction Of The Necessary Rainwater Drainage System (Linear Drainage) Located Next To Football Pitch No. 1, - Reconstruction Of The Eight-Track Straight Running Track Into A Six-Track Running Track With A Length Of Approx. 133 M, With A Polyurethane Surface (Extension Of The Circular Track Section) Located Next To The Football Pitch No. 1, - Reconstruction Of The Existing And Construction Of New Technical Infrastructure In The Field Of Lighting Of The Football Stadium No. 1/Athletics Stadium (Underground Installation, Lighting Masts) And Reconstruction And Construction Of A New Rainwater Drainage System, - Construction Of Covered Stands At The Football Pitch No. 1, A Photovoltaic Installation With An Energy Storage Facility Should Be Planned And Designed On The Roof Of The Stands, - Construction Of A Landing Hill For Long Jump And Triple Jump At The Football Pitch No. 1, - Construction Of A High Jump Jump With A Polyurethane Surface At The Football Pitch No. 1, - Construction Of A New Javelin Throwing Range At The Football Pitch No. 1, - Construction Of A New Discus And Hammer Throwing Range At The Football Pitch No. 1, - Construction Of A New Pole Vault Jump At The Football Pitch No. 1, - Assembly Of Small Elements Architecture (Benches, Waste Bins), - Construction And Adaptation Of The Communication System To The Solutions Provided For In The Reconstruction Of The Stadium, Including Internal Roads, Sidewalks, Parking Spaces Necessary For The Operation And Use Of The Facility, Entrances, Parking Lots, Pedestrian Routes, Pedestrian And Driving Routes, Etc.; - Construction Of A Rainwater Drainage System Together With A Pitch Drainage System, - Construction Of An Irrigation System For Pitch No. 1, - Creation Of Space For An Outdoor Ice Rink Or A Synthetic Ice Rink, - Construction Building Of Locker Rooms For Sports Clubs And Locker Rooms For Referees. Above Buildings Should Be Equipped With A Complete Set Of Electrical And Sanitary Installations, Including: Water And Sewage, Central Heating, Air Conditioning, Etc., - Construction Of An Outbuilding. The Building Should Be Equippe
|