|
Tender Available Date: Wednesday, May 27, 2026.Tender Closing Date: Thursday, July 16, 2026.Pre-Tender Meeting: Session No. 1: June 10, 2026 At 10:00 Am., Main Conference Room At 1St Floor 4709, 44 Ave, Stony Plain, Ab, T7z 1N4. Attendees May Also Join The Meeting Via Microsoft Teams.Session No. 2: To Be Determined (Tbd)Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation And Economic Corridors. E-Mail: Ikhtiyar.Mammadov@Gov.Ab.Ca.Tenders Will Only Be Received By Email At Trans.Tender@Gov.Ab.Ca, Before 2:01:00 P.M., For Construction Of The Following Work:Tnd0012201grading, Granular Base Course (Gbc), Asphalt Concrete Pavement (Acp), Street Light Installation And Other Work2:36, Interchange Construction At Jct. Hwy. 2 And Cardiff Road/Twp. Rd. 554, S. Of Morinville, Abconstruction Of Structural Steel Girder Bridge, Construction Of S.P.C.S.P. Culvert And Other Work2:36, B.F. 85214 - Carrying A Local Road (Cardiff Road/Twp. Rd. 554) Over Hwy. 2, S. Of Morinville, Abasphalt Concrete Pavement (Acp) And Other Work2:36, 5 Km S. Of Hwy 642 To Town Of Morinville, Abkilometre 5.100 To 9.360 (Nbl,Sbl)B.F. 85220 - Canal Bridge Culvertnorth Central Regionapproximate Quantities:Roadwork:279,400 Cubic Metre Common Excavation61,600 Cubic Metre Borrow Topsoil Excavation1,148,500 Cubic Metre Borrow Excavation270,000 Cubic Metre Rippable Rock Excavation - Premium610 Square Metre Mechanically Stabilized Earth Walls365 Metre Culverts - Supply And Install (600 Mm Dia. C.S.P.)345 Metre Culverts - Supply And Install (800 Mm Dia. C.S.P.)265 Metre Smooth Wall Steel Pipe - Supply And Install (750 Mm Dia.)180 Metre Smooth Wall Steel Pipe - Supply And Install (900 Mm Dia.)125,500 Square Metre Preparing Subgrade Surface (First Layer)107,100 Tonne Granular Base Course Des. 2 Class 25340,000 Square Metre Topsoil Placement40 Hectare Drill Seeding1,320 Metre Concrete Curb (125 Mm Semi Mountable Curb) (Pin-On Type)1,070 Metre Curb And Gutter (125 Mm Semi Mountable Curb And Gutter)1,750 Square Metre Pccp Concrete Truck Apron (240Mm Thick)2,500 Square Metre Solid Concrete Medians90,000 Square Metre Cold Milling Asphalt Pavement - 50 Mm Depth57,000 Tonne Asphalt Concrete Pavement - Eps Mix Type H2 (Pg 58-28)732 Metre Strong Post W-Beam Guardrail - Supply And Install4,130 Metre Trenching And Backfilling3,550 Metre Secondary Cable - Supply And Install (4C #12 Teck 90)61 Unit Pre-Cast Concrete Street Light Base - Supply And Install51 Unit Street Light Standard - Supply And Install (15M X 2.5M Single Davit And Luminaire)2 Unit Distribution Enclosure - Supply And Install1 Lump Sum Traffic Signal System - Supply And Install (Hwy 2 & Cardiff Road Detour)Bridge Culvert - Bf 85220:1 Lump Sum Excavation - Structural (B.F. 85214)1 Lump Sum Backfill (B.F. 85214)1,642 Metre Supply Of Piling - Plain Steel H-Pile - Hp 310X11083 Pile Pile Set-Up (Driven Piles) - Hp 310X11062,667 Kilometre Plain Reinforcing Steel - Supply (B.F. 85214)95,377 Kilometre Stainless Reinforcing Steel - Supply (B.F. 85214)158,044 Kilometre Reinforcing Steel - Place (B.F. 85214)516 Cubic Metre Concrete (Class C) - Supply And Place (B.F. 85214)652 Cubic Metre Concrete (Class Hpc) - Supply And Place (B.F. 85214)1 Lump Sum Structural Steel - Supply And Fabrication, Delivery And Erection (B.F. 85214)1 Lump Sum Bearings - Supply And Fabrication, Delivery And Installation (B.F. 85214)1 Lump Sum Deck Joint Assemblies - Supply, Fabrication, Delivery And Installation (B.F. 85214)1 Lump Sum Bridgerail - Supply And Fabrication, Delivery And Installation (B.F. 85214)2,240 Square Metre Waterproofing430 Tonne Asphalt Concrete Pavement - Mix Type H2 (Pg 58-28)159 Metre Drain Troughs (B.F. 85214)Bridge Culvert - Bf 85220:1 Lump Sum Excavation - Structural (B.F. 75984)1 Lump Sum Remove And Salvage Bridge Culvert (B.F. 75984)1 Lump Sum Spcsp - Supply (B.F. 85220)1 Lump Sum Spcsp - Assembly (B.F. 85220)1 Lump Sum Backfill (B.F. 85220)Contractor To Supply All Materials.Contract Completion Date: October 15, 2028.
|